My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-22_REVISION - M2003052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003052
>
2015-09-22_REVISION - M2003052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:12:39 PM
Creation date
9/25/2015 9:04:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003052
IBM Index Class Name
REVISION
Doc Date
9/22/2015
Doc Name
Windy Ridge Pit, Succession of Operators Approval, Revision SO-01
From
DRMS
To
Ron Peterson
Type & Sequence
SO1
Email Name
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />September 22, 2015 <br />Mr. Justin Emick <br />J. E. Cattle, LLC <br />6424 Hwy 287 <br />Lamar, CO 81052 <br />Re: Windy Ridge Pit, Permit M-2003-052, Succession of Operators Approval, Revision SO -1 <br />Dear Justin. Emick: <br />On September 18, 2015, the Division of Reclamation, Mining and Safety approved the succession of <br />operators from Carder, Inc. to J. E. Cattle, LLC for this operation. J. E. Cattle, LLC is now the permitted <br />operator of the Windy Ridge Pit, and as such, is responsible for all provisions in M-2003-052, as well as <br />those specified in the Rules and Regulations. Carder, Inc. is relieved of all responsibilities concerning this <br />operation. <br />Please Note: <br />1. All of the application materials, as amended and supplemented, are in integral part of your permit. <br />They have been incorporated into the permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for operation personnel, to help <br />ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit <br />may require a modification to the permit. We suggest consulting the Rules and Regulations and/or <br />contacting us to determine if a modification to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, you must submit an annual fee and annual report to us. <br />Please consult the Rules, Act, and your permit for specific requirements. <br />The estimated liability amount of $33,000.00 for Windy Ridge Pit has been provided by Financial Warranty <br />Letter of Credit No. issued by Colorado East Bank & Trust. <br />The transfer of this permit does not result in the transfer of any other permits or licenses, with this <br />Division, the State, or Federal Agency, which might be associated with this operation. <br />If you have any questions, contact me. <br />Sincerely, <br />Amy Eschberger <br />Environmental Protection Specialist <br />Cc: Wally Erickson, Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.