Laserfiche WebLink
Boettcher Sandstone Quarry — Reclamation of the Sandstone Quarry was reviewed with <br />C&H Excavation and a Technical Revision will be prepared and submitted for approval to <br />the DRMS by the end of September 2015. Upon approval Holcim will initiate the final <br />reclamation project. <br />With respect to the Dilts Limestone Quarry (M-1982-101) and the Boettcher Gypsum <br />Quarry (M-1977-346), reclamation and seeding was completed in November 2014. Both <br />quarries will be monitored and reseeded as required. <br />Should you have any questions, please do not hesitate to contact me at (719) 288-1402 or by e- <br />mail at mike.toelle(a)-holcim.com. Thank you for your attention to this request. <br />Sincerely, <br />Michael B. Toeile <br />Sr. Mining and Raw Materials Specialist <br />Holcim (US) Inc. - MPC <br />Cc: Joel Bolduc, Environmental Manager <br />Michael Nixon — Performance Manager <br />