My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-17_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2015-09-17_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:49 PM
Creation date
9/21/2015 10:45:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
9/17/2015
Doc Name
Response Letter
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
MR287
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
insulation. The addition will add approximately 2,886 square feet to the existing bathhouse with approximate <br />dimensions of 31 x 98 feet. The design and structure of the addition match the existing building. <br />The topsoil stockpile originally designated for reclamation of the parking lot and building area (Stockpile SF -3, as <br />shown on Map 29) will be used to cover the new portion of the bathhouse during reclamation as specified on page <br />2.05-101. <br />Main Parking Area <br />Parking for the administrative staff and miners is located east of the bathhouses. The parking area was originally <br />surfaced with tar -sand material, but this material has been overlaid with asphalt, and drainage will be conveyed via the <br />existing system. In order to accommodate parking requirement for mine employees and visitors, the layout of the <br />parking area has been modified as shown on Map 24. As shown on the map, parking islands have been constructed <br />to establish parking corridors and walkways in the parking area. The parking islands have curbs made of railroad <br />track and concrete light pedestals. Connections from the light pedestals extend to elevated outlet boxes which <br />provide cold -weather plug -ins in the parking area. <br />Three additional parking islands were permitted and constructed in 1995, as shown on Map 24. The new parking <br />islands are consistent in design with the existing islands. There are two parking islands per line of cars. Each <br />island is equipped with 8 electrical receptacles hung on a one -rail structure supported by an oblong railroad rail <br />base. Bonding calculations addressing the new parking islands are presented in Appendix A. Drainage around the <br />parking area was modified as per the details provided on Map 24. The ditch between the current parking area and <br />access road was fiIIed and runoff will be directed into Ditches D-4 and G-4. The guard shack was converted into a <br />storage building and it is located on the west end of the mobile equipment parking/material storage yard. <br />In 2005, the unpaved eastern portion of the existing parking lot (approximately 130 x 180 feet) and the mine ready -line <br />parking area west of the operations center, were leveled and regraded, with excavated material being used to fill-in and <br />bring low areas up to a consistent grade. Road -base material was subsequently brought in and compacted over the <br />regraded parking areas to establish a suitable base for paving operations. These areas were then paved with <br />approximately 3-4 inches of asphalt paving material. The existing perimeter surface drainage systems were maintained <br />or reestablished during grading, base preparation, and paving operations. <br />MRt4-275 2.05-17.5 02/26/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.