Laserfiche WebLink
A <br />9860 <br />9855 <br />9850 <br />9845 <br />9840 <br />9835 <br />9830 <br />A <br />Storage-DepthStormwater r /,A <br />MINERAL MOUNTAIN PROJECT <br />Free Board <br />120g ft wide Vol = 9.300 cu ft 70k oal <br />UNDERGROUND MINE <br />TOTAL MINE P92MIT AREA <br />9.35 ACRES <br />//„/,,,,//////,/,//////,///,////,/,///„/,/ <br />HISTORICAL DISTURBANCE -4.4 ACRES <br />SECTION A -ACROSS WORKING AREA AND STORMWATER STORAGE AREA <br />(SECTION IS TYPICAL AND LOCATION WILL VARY) <br />Exhibit Map E-2 Stormwater Runoff <br />Cripple Creek Project <br />Owner Address: Owner Phone Number: <br />Mineral Mountain Gold, LLC 719-689-5965 <br />P.O. Box 247 <br />Cripple Creek, Colorado 80813 <br />EXPLANATION <br />Permit Boundary <br />9900 True North <br />Contour (interval 5 feet) <br />Magnetic North <br />9' <br />Surface Water Flow Direction <br />Mapped Pits, Adits and Shafts <br />Feet <br />0 30 60 <br />SCALE 1"=60' <br />M-2014-045 AR01 Contour Interval = 5 feet <br />^ -^- ,.^w"1% .e r <br />90 PLOW DESIGN NECESSARY OF ACCESS ROAD <br />SEP 16 Liu I <br />DIVISION OF RECLAMATION <br />Exhibit Map E -1A — Permit and Adjacent Area MINING AND SAFETY <br />brawn <br />BRAUN ENVIRONMENTAL, It <br />355 South Teller Street Ste 200 <br />Lakewood, COLORADO 80228 <br />PHONE (303) 988-7697 <br />Mineral Mountain Gold, LLC <br />Cripple Creek Project, Cripple Creek, Co <br />November 19, 2014 Drawn by: Staff <br />Date Rev: 8/2-87-15 <br />Checked by: C.A. Braun <br />ENGINEER'S CERTIFICATION <br />This report was prepared by the Engineer who's signature appears below or <br />the engineer's direct supervision). <br />SIGNATURE: 4/ G��;/ !// ,r , <br />No. 22601 <br />DATE: <br />SITE DESCRIPTION <br />MINERAL MOUNTAIN PROJECT <br />ACTIVITY <br />UNDERGROUND MINE <br />TOTAL MINE P92MIT AREA <br />9.35 ACRES <br />TOTAL DISTURBED AREA <br />HISTORICAL DISTURBANCE -4.4 ACRES <br />NEW DISTURBANCE- LESS THAN 0.3 ACRES <br />SCS RUNOFF CURVE VALUES (CND <br />UNDISTURBEDAREA 442 DISTURBEDAREAS 52 CONCRETEROOF 98 <br />DISCRIPTION OF DISTURBED AREAS <br />ROAD SURFACES CONSIST OF POORLY GRADED MIXTURE OF ROCK UP TO 3 IN <br />DEA. HISTORIC MINING DISTURBED SURFACES INCLUDE LEVELED AREAS AND <br />WASTE ROCK PILES <br />DESCRIPTION OF NONDISTURBED VEGETATION AREAS <br />TIMBER COVERED WITH GRASSES AND SHRUBS MIXED IN LESS SHADED AREAS <br />POTENTIAL POLLUTION SOURCES TO STORMWATE2 <br />NO FOLUTION SOURCES - NO HAZARDOUS GEOLOGIC SUBSTANCES, NO OFflN <br />CONTAINERS OR CHEMICALS STORED OUTSIDE <br />LOCATION OF NO” I ORMWA I E DISCHARGE <br />NO SOURCES KNOWN <br />NAME AND LOCATION OF RECEMING WATERS <br />DISCHARGE TO UNNAMED NORTFFTRINDING DRY GULCH -GULCH CONNECTS TO <br />SPRING CREEK, AN INTERMITTENT STREAM A DISTANCE OF 2,200 FEET <br />NORTHWEST OF THE PERMIT AREA. <br />RESULTS OF CALCULATIONS <br />MAXIMUM SURFACE FLOWS - 24 -HR 100 -YR EVENT <br />NO DIVERSION POINTS NECESSSARY. ALTHOUGH NOT REQUIRED PER <br />REGULATIONS, WORK SURFACE BERM HAD CAPABILITY OF RETAINING 300 <br />PERCENT OF ENTIRE 10 -YEAR 24 STORM EVENT RUNOFF FROM DISTURBED <br />GROUND ANDOVER 200 PERCENT OF 100 -YEAR 14 HOUR EVENT. DISCHARGES <br />VIA RAPID INFILTRATION INTO WORK AREA SURFACE <br />NEW PRECIPITATION WATER GENERATED BY OPERATION <br />2.47 INCHES PRECIPITATION PRODUCES MAXIMUM VOLUME OF 140 CUBIC FEET <br />(NEN DISTURBANCE) (CN= 98) <br />WITH NO FLOW BEYOND SURFACE SHEET FLOW WITHIN CONTAINED AREA FOR <br />(BUILDINGS AND CONCRETE SURFACES ASSOC WITH <br />24-HOUR I0 -YEAR EVENT <br />CURRENT OPERATION - 700 SQ FT TOTAL) <br />VOLUME GENERATED .ON OLD DUMP —SURFACE - OLD <br />2.47 INCHES PRECIPITATION PRODUCES 2,700 CU FT FOR THE 10-Y EAR EV ENT <br />DISTURBANCE (CURRENT WORK AREA) (CN = 52) <br />TOTAL AREA - 22,000 SQ FT <br />TOTAL CALCULATED STORM✓VATER GENERATED WITHIN <br />2,850 CU FT (SUM OF BUILDING RUNOFF PLUS HISTORIC GROUND SURFACE) <br />CURRENT WORK AREA (10- YEAR STORM) <br />RUN-OFF STORAGEAREA CAPACff1' <br />9,300 CU FT AT A DEPTH OF 18 IN (7,000 So FT TYPICAL) <br />ANTICIPATED DEPTH OF FILL TO 6 INCH FOR 10 -YEAR EVENT <br />FACTOR OF SAFETY OF 3 INCLUDES VOLUME FOR NEW RUNOFF ASSOCIATED <br />WITH PERMITTEDOPERATION PLUS RUNOFF FOR HISTORIC DISTURBANCE <br />DESIGN DETAILS <br />I. bORMWA I ER CONTAINMENT AREA TO CONSIST OF GENTLY SLOPING DEPRESSION MAINTA INED WITHIN THE WORKING AREA <br />DESIGNED TO CONTAIN THE CALCULATED VOLUME GENERATED BY RUNOFF FROM THE 10-Y FAR STORM EVENT. BOTTOM AND SIDES ARE <br />SUCH TO ALLOW COLLECTED STORWVATER TO BE RELEASED VIA INFILTRATION. BERM SPECIFICATIONS INCLUDE HEIGHT OF 2.0 FEET <br />ANDA WIDTH OF NO LESS THAN 2.0 FEET AT A DISTANCE OF 1.5 FEET BB -OW THE CREST. THE BERM IS TO BE LOADER- PLACED AND <br />COMPACTED AND SHALL BE COMPOSED OF POORLY SORTED NATIVE MATERIALS SIZED FROM CLAY TO MINUS 4 INCHES. THE STORAGE <br />AREA SHALL BE SUCH THAT A FREE BOARD OF 1.0 FEET WILL BE MAINTAINED. CONTAINMENT IS RECOMMENDED BUT NOT REQUIRED BY <br />REGULATION AT THIS TIME HOWEVER, IF ACID GENERATING ROCK SHOULD BE STORED ON SURFACE STORE MVATER RETENTION SHALL <br />BE MANDATORY. <br />2. NO RUN-ON DIVERSIONS ARE NECESSARY, AS TOTAL DISTURBED AREA IS SO SMALL. UPGRADIENT SEDIMENTATION AREAS AND <br />DIVERSIONS IN THE FORM OF ROADS AND TRAILS ARE ALREADY NPLACE CONSTRUCTION OF ADDITIONAL STRUCTURES WOULD ADD <br />LITTLE INCREASE IN PROTECTION AND ONLY INCREASE AREA OF DISTURBANCE THE MAIN ACCESS ROA D SERVES AS A DIVERSON FOR <br />TOPOGRAPHICALLY UPGRADIENT SHEETFLOW WATERS GENERATED TO THE SOUTH AND DIVERTS THEM TO EASE NO OTHER RETENTION <br />PONDS, LINED OR UNLINED CHANNELS, OR OTHER RUN-ON AND RUN-OFF CONTROLS, OR OUTLET CHANNELS ARE NECESSARY FOR THIS <br />SITE AS ANY COLLECTED SURFACE WATERS ASSOCIATED WITH THE NEW DISTURBANCES ARE DISSIPATED VIA INFILTRATION. <br />3. PERMANENT OR TEMPORARY SOIL STABILIZATION MEASURES SHALL BEAPPLIED TO NEWLY DISTURBED AREAS NO LONGER TO BE <br />USED WITHIN 30- DAYS AFTER USE HAS CEASED. ITIS RECOMMENDED THAT PERMANENT S® MV IS TO BE APPLIED NO EARLIER IN THE <br />YEAR THAN NOVEMBER AND NO LATER THAN MAY TO MAXIMIZE GERNINATION OF SEED. THE APPROVED MIX SHALL BE APPLIED AT RATES <br />RECOMMENDED BY THE ENGINEER AND S® VENDORS. <br />4 A SEDIMENT DISSIPATION AREA IS TO BE LOCATED DOWNGRADIFNT OF THE WORKING SURFACE AND SERVE ASA BACKUP FOR FOR <br />SEDIMENTOONTROL THE DESIGN CONSISTS OF A NEAR -LEVE- ROAD SURFACE TO COLLECT SEDIMENTS. ALL CONTROLS, ARE TO BE <br />MAINTAINED FOR THE LIFE OF THE PROJECT. <br />5. AREAS WHERE FINE GRAINED SOILS ARE SUBJECT TO EROSION SHALL BE PROTECTED USING SILT FENCE PLANTEDGRASSES, <br />CRIMPED MULCH, OR OTHER SUITABLE MEANS. <br />