Laserfiche WebLink
Table 1 <br />VALCO, INC. <br />SWSP PROJECTED DEPLETIONS SUMMARY (June 2015 - May 2017) <br />Annual Replacement Credits Summary (acre-feet) <br />Canon City and Oil Creek Ditch Credits <br />UAWCD Lease Water <br />38.34 <br />12.00 <br />TOTAL Credits <br />50.34 <br />Note: UAWCD lease amount is 7-12 ac -ft per year for 5 years. <br />1 Depletions Summary <br />[ I ] State well permit number. <br />[2] Total exposed groundwater surface area for the accounting period. <br />[3] Pre -1981 exposed groundwater surface area. <br />[4] Post -1980 exposed groundwater surface area, [2] - [3]. <br />[5] Evaporation rates from Consolidated Water Supply Plan for Valco's Arkansas River Watershed Depletions; prepared by <br />WRC Engineering, June 1997. <br />[6] Evaporation loss, [4] * [5]. <br />[7] Total Depletions, equal to [6]. <br />BBA <br />water consultant, BISHOP-BROGDEN ASSOCIATES, INC. Printed Ore9/9, Ol? PJB <br />Total <br />Pre -1981 <br />Post -1980 <br />Evaporation <br />Evaporation <br />Total Unlagged <br />Pit Well Permit <br />Exposure <br />Exposure <br />Exposure <br />Loss Rate <br />Loss <br />Depletions <br />(acres) <br />(acres) <br />(acres) <br />(ft/yr) <br />(af/ ) <br />(af) <br />- ] <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />Canon City East 52183-F <br />22.60 <br />15.40 <br />7.20 <br />3.10 <br />22.32 <br />22.3 <br />[ I ] State well permit number. <br />[2] Total exposed groundwater surface area for the accounting period. <br />[3] Pre -1981 exposed groundwater surface area. <br />[4] Post -1980 exposed groundwater surface area, [2] - [3]. <br />[5] Evaporation rates from Consolidated Water Supply Plan for Valco's Arkansas River Watershed Depletions; prepared by <br />WRC Engineering, June 1997. <br />[6] Evaporation loss, [4] * [5]. <br />[7] Total Depletions, equal to [6]. <br />BBA <br />water consultant, BISHOP-BROGDEN ASSOCIATES, INC. Printed Ore9/9, Ol? PJB <br />