Laserfiche WebLink
RECEIVED <br />IVERSON <br />MINE <br />SEP 1 % 20115 <br />h41NINU'_ PLAN <br />DIVISION OF RECLAMATION <br />aPJ�L;XA'k]L'I%S" L. 3.,_L,AMM"a Kms, �����:.=Ih� <br />OWNIV �� <br />��,.av,�1E� <br />MININGAND SAFETY <br />k. <br />NOT TO SCALE <br />• <br />1 -. � <br />111 <br />a <br />�J � f z' <br />, <br />—Q <br />S <br />iyy� <br />a <br />Y ' <br />` <br />^w ` <br />i <br />{{JJJJ <br />k <br />i <br />�• y <br />� <br />_ <br />_ C_� <br />CONVEYOR AND <br />RAILROAD CROSSING <br />SLOPES COMPLETED <br />-!!TUNNEL REMOVED <br />SLOPES NOT YET COMPLETED <br />'f <br />BACKFILLED, PER SEO- <br />REQUIREMENT"`" <br />RIVER BREACH 05-25-14°_ <br />r <br />i <br />CACHE LA POUDRE FLOOD <br />REPAIRED AND HELD DURING <br />MAY 2015 FLOODING <br />i <br />NOTE: ALL MINING COMPLETED. <br />SPILLWAY DESIGN COMPLETED <br />(COPY ATTACHED), SPILLWAYS TO <br />BE INSTALLED FALL 2015 <br />L.. <br />2015 Annual Report <br />DRMS <br />M-2011-001 <br />