Laserfiche WebLink
Bromley Lakes Pit 2015 Annual Report <br />Prepared for: <br />Ready Mixed Concrete Company <br />Prepared by: <br />Michael J. Hart, Hart Environmental <br />Permittee Name: Ready Mixed Concrete Company (RMCC) <br />Permit Number: M-1987-049 <br />Operation Name: Bromley Lakes Pit <br />Anniversary Date: September 29, 2015 <br />Annual Fee Due: $791.00 <br />County: Adams <br />RMCC's Bromley Lakes Pit was actively mined during the 2014-15 reporting <br />period of the Annual Report. Mining activities during the reporting period occurred in <br />Phases 11 and 18 and reclamation activities occurred in mine Phases 14, 16 and 17 of the <br />Bromley Lakes (DRM&S Permit #M-1987-049). Excavated sand and gravel was <br />transported by conveyor from the active mine phases to the sand and gravel processing <br />plant. Wash fines from the processing plant were discharged into the Bromley Lakes <br />settling pond located in Cell 2. <br />Weed control at Bromley Lakes, during the period of this annual report, included <br />mowing and spraying. <br />Weather permitting; mining and reclamation activities at the Bromley Lakes Pit will <br />be conducted on a year round basis. <br />