Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task 9 002 Page 2 of 3 <br />1 ruck bca (voluluc ) basis: <br />Struck Volunie: <br />l-*).uu <br />LCY <br />Heaped Volume: <br />18.00 <br />LCY <br />Average Volume: <br />16.50 <br />LCY <br />Adjusted Volume: <br />18.00 <br />LCY <br />Final TrucK Volu«<e based Ou Nun be, of Loaae, Pabbes: 16.09 LCY <br />toudinp- Too! QUVUCiLV <br />maneuver): <br />buCKet SILe clabb: Lzu6C <br />Rated Capacity: <br />2.980 <br />LCY (heaped) <br />Bucket Fill Factor: <br />0.900 <br />Other - soil, boulders, roots (80 -100%) 0.900 <br />Adjusted Capacity: <br />2.682 <br />LCY <br />JOB UO.M.6u.. cul I eut;U113: <br />MOCK ;le: <br />J.tc Altitude (ft.): /200 feet <br />Truck <br />Loader Source <br />Altitude Ad': <br />1.000 <br />1.000 (CAT HB <br />Job Efficiencv: <br />0.830 <br />0.830 (CAT HB) <br />Net CMtMivu: L_ 0.830 1 U.SJU <br />Loading Tool Cycle Time: Numbe, of Loadiig I ool Passes Kequiea tu rill <br />Excavators and Front Shovels: rI UCK: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />selected values . ;ih;.. th;a Baa;;, Rating: AVERAGE <br />1 iaCK Loaae,s - Mateual uesci;pti0u: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, <br />.NA minutes <br />maneuver): <br />Cycle 1;...e racto.5 <br />Factor min. <br />Source <br />Mat'c.;al: <br />NA <br />NA <br />Cat HB <br />MOCK ;le: <br />NA <br />NA <br />(t -at rib <br />Truck Owne,Sni : <br />NA <br />NA <br />(Cut rib) <br />Operation: <br />I NA <br />NA <br />(Cat H13) <br />Dump Target: <br />I NA <br />NA <br />(Cat HB) <br />Net Cycle Time Adjustment: <br />NA <br />minutes <br />Adjusted Loader Cycle Time: <br />0.293 <br />minutes <br />Net Lvad T;...e t,e. Tuck: <br />1.35:) <br />minutes <br />u, ucK Cvcte Glue: <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />1 iuCK Lvaa 1 uu'c: LOUD MIIIutCS Adjuatcd fo. 34cc altitude: t.:)63 Minutes <br />Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Mi,lutes <br />Time: <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered <br />...a;mained 3.0 <br />uIRCES Lost Estimating Software <br />