Laserfiche WebLink
Task description: <br />Site: Forest Lakes Pit #1 <br />rROJECT IDENTIFICATION <br />;USI JUMMAKY WUKK <br />Yen nut AM10n: 201.*) <br />Task #: 000 State: Colorado <br />UUM YA//LUID t-Uunty: La Plata <br />UJeI: LJ W ....................... <br />Agency v, v,gan,cat,v„ „a,nc: UK1V1S <br />TASK LIST (DIRECT COSTS) <br />rennnivicb4: M19811m <br />Abbreviation: None <br />r nlena,ne: M 1 JS -000 <br />Task <br />Form <br />Descri tion Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />slope reduction to 3H:1 V DOZER <br />1 <br />1 <br />1 <br />1 <br />3.52 <br />$735.00 <br />$3,394.00 <br />$2,474.00 <br />$2,990.00 <br />Replace topsoil .5" dee o�m 2 ac,e a,ea TRUCKI <br />4.16 <br />Reve etate 2 acres REVEGE <br />8.00 <br />haul e u n„int r a,nd frn,,,jub Sete MOBILIZE <br />2.93 <br />L— 5U Is 1 V 1 -ALS: <br />18.61 <br />$ $9,593 <br />INDIRELT c;uSTS <br />$193.78 <br />OVERHEAD AND FROFIT: <br />$100.73 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />9.31 <br />Profit: <br />10.00 <br />Total = <br />$193.78 <br />Total -_ <br />$100.73 <br />Total = <br />$699.36 <br />Total = <br />$959.30 <br />TOTAL O & P = <br />$1,953.17 <br />CON 1 KAC 1 AMUUN 1 (d„crt + U & Y) - <br />$1 1.J4b. 1 / <br />LEGAL - ENGINEtRING - FKOJhC I MANAGEMhN 1: <br />Financial Warranty processing (legal/related costs): <br />500.00 1 otal = <br />500.00 <br />Engineering work and/or contract/bid preparation: <br />0.00 Total = <br />$0.00 <br />Reclamation management and/or administration: <br />5.00 <br />$577.31 <br />CONTINGENCY: <br />0.00 Total = <br />$0.00 <br />TOTAL INDIRECT COST <br />$3030.48 <br />1UTAL13V1VUAIVIVUN1 ((litcit+ivaincit)= 511.,01.5.48 <br />