Laserfiche WebLink
9. Estimated acres to be reclaimed in the next report year: <br />10. Total acres in various stages of reclamation, since permitted exploration activities began: <br />Page 4 of 6 <br />PP Vey r, -y <br />Total acres y ,-eel' Total acres <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOV <br />Total acres Jj- feet Total acres <br />backfilled: b7 seeded w/ <br />If "NO" please explain: <br />w/topsoil Oy mulched w/ <br />YES NO N/ <br />15. Are all hazardous materials stored within approved spill containment structures? <br />r approved mix: replaced: q I-re approved mulch: <br />Total acres f ee_r Total acres Topsoil Mulch application <br />graded: b fertilized w/ Q replacement rate (tons/ac): <br />a -« apvd fertilizer: depth (in.): <br />Seed Fertilizer Mulch <br />application^ application application Omethod: method: method: <br />11. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOV YES NO N/A <br />If "NO", please explain: <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br />If "NO" please explain: <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of 113r, <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/ <br />15. Are all hazardous materials stored within approved spill containment structures? YES NO / <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring informati <br />annually? YES NO N/A <br />If "Yes", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in place <br />and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: C S <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />l q h / <br />015 <br />s%dam <br />To T v P -p t efLf c i -M eA;7