Laserfiche WebLink
DEER TRAIL CONSERVATION DISTRICT <br />133 West Bijou Avenue <br />BYERS CO 80103 <br />303 822 5257 EXT 101 <br />August 11 2015 <br />Colorado Division of Reclamation <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street Room 215 <br />Denver CO 80203 <br />RECEIVED <br />Auu 1 2015 <br />DIVISION OF RECLAMATION <br />MWING AND SAFETY <br />Joe Lindsay President <br />Darrel Stoner Vice President <br />John R Price Sec Treas <br />Joey Kalcevic Member <br />Larry Sargent Member <br />RE 5A Aggregate LLC Deer Trail Pit Permit No M 1988 090 <br />Dear Tyler <br />During the construction phase we would like to see the top soil <br />stripped and stockpiled out of the way of area to be mined and later <br />brought back in after the pit is all done with the mining operation <br />and spread at a depth of 3 to six inches deep The stockpile should <br />be on a 3 1 side slope and protected from any wind or water erosion <br />During the mining operations the soil should be excavated on a 3 1 <br />side slope and all stockpiled soil that is mined and not loaded should <br />be protected with best management practices so it doesn t blow or <br />wash away during construction