My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-14_REVISION - M1978085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978085
>
2015-09-14_REVISION - M1978085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:20:25 PM
Creation date
9/15/2015 11:05:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978085
IBM Index Class Name
REVISION
Doc Date
9/14/2015
Doc Name
Notice AR01
From
DRMS
To
Various
Type & Sequence
AR1
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E - RECLAMATION PLAN II <br />I THE OVERALL RECLAMATION PLAN ON THE SMITH PIT #20 AND <br />THE CONVERSION N0. 1 WILL BE IN THREE GENERAL STAGES. FIRST, <br />THE EXISTING SMITH PIT, WHICH IS MINED OUT, WILL BE RECLAIMED <br />THIS OCTOBER IF THE MATERIALS STOCKPILE HAS BEEN DEPLETED BY <br />THEN, OTHERWISE THE RECLAMATION WILL PROCEED IN OCTOBER OF 1991. <br />THE SECOND RECLAMATION PHASE WILL FOLLOW THE MINING OPERATION <br />IN THE LOTS 1, 5 & 10 ALL LYING NORTH OF THE COUNTY ROAD # 4. <br />THE THIRD RECLAMATION PHASE WILL FOLLOW MINING IN LOT 11 LYING <br />SOUTH OF THE COUNTY ROAD #4. <br />Z. THE POST -MINING USE OF THE LAND WILL RETURN TO THE <br />PRE -MINING USES FOR LIVESTOCK AND WILDLIFE GRAZING. <br />RECLAMATION WILL PROCEED IN ACCORDANCE WITH THE APPROVED <br />RECLAMATION PLAN ON FILE WITH THE MLRD AND WITH THE <br />RECOMMENDATIONS AND SEEDING SELECTIONS BY THE U. S. $OIL <br />CONSERVATION REPORT ALSO ON FILE WITH THE MLRD, AND WITH THE <br />SPECIAL CONDITIONS IN BLM PERMIT N0. CO -010 -FU -88-3 <br />ATTACHED AND MARKED EXHIBIT 0. <br />3 THE MAXIMUM GRADIENT OF THE RECLAIMED SLOPES WILL BE <br />3:1 (HORIZONTAL TO VERTICAL). ALL GRADING SHALL BE DONE IN A <br />MANNER TO CONTROL EROSION AND SILTATION OF THE AFFECTED <br />LANDS, AND TO PROTECT THE AREAS OUTSIDE OF THE AFFECTED LAND <br />FROM SLIDES OR OTHER DAMAGE. ALL HIGHWALLS SHALL BE <br />ELIMINATED. <br />4. THE TOPSOIL OCCURS AT A DEPTH AVERAGE OF 6-8 INCHES AND <br />IT WILL BE REPLACED ACCORDINGLY. <br />5. SEEDING WILL BE DONE DURING THE LATE FALL OR EARLY <br />WINTER. THE TOPSOILED AREAS SHALL BE SCARIFIED TO A DEPTH OF <br />4 TO 6 INCHES. <br />6. IN ADDITION TO THE SPECIES SELECTION OF THE BLM AND THE <br />US SOIL CONSERVATION REPORT THE OPERATOR SHALL INCLUDE LADAC <br />ALFALFA FOR A MORE DIVERSE AND BETTER FORAGE BASE FOR BIG <br />GAME ANIMALS. <br />%. IN AREAS OF ONE ACRE,OR MORE, THE SEED MIXTURE WILL <br />BE DRILLED INTO THE SOIL AND HARROWED AFTER APPLICATION. (IN <br />SMALLER AREAS THE SEED WILL BE BROADCAST ONTO THE SOIL AT <br />TWICE THE RECOMMENDED RATE FOR DRILLED APPLICATION AND THEN <br />RAKED INTO THE SOIL.) <br />S. MULCH WILL BE WHEAT STRAW OF WHICH 50% WILL BE 10 <br />INCHES OR LONGER. THIS WILL BE APPLIED AT THE RATE OF Z TON <br />TO THE ACRE, HELD DOWN BY NETTING OR OTHER SUITABLE METHOD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.