My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-06-01_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
1994-06-01_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 12:49:29 PM
Creation date
9/14/2015 9:23:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
6/1/1994
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE (PR3)
Permit Index Doc Type
Findings
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
identification, mining plan contingencies, and spoWmine soil reconstruction <br /> plans (respectively) that address acid or toxic spoil horizons. <br /> C. Ground and Surface Water Monitoring <br /> 1. The applicant will conduct monitoring of ground water in a manner approved <br /> by the Division (4.05.13(1)). The ground water monitoring plan is as <br /> follows: <br /> a. The baseline data gathering program (New Horizon 2 - July 1986 to July <br /> 1987) took monthly static water levels and quarterly water quality <br /> samples in January, April, July and October. Results are discussed and <br /> tabulated in Appendix 3 of the permit application. <br /> b. All wells in the New Horizon 1 area will be monitored on a monthly <br /> basis for water levels and adjusted to MSL. Water Quality parameters <br /> will be collected and analyzed on a semi-annual basis. <br /> All wells in the New Horizon Mine 2 are will be monitored monthly for <br /> water levels adjusted to MSL and samples will be collected quarterly for <br /> water quality parameters with the exception of wells 13, 14 and 15 <br /> which will be on a semi-annual basis. <br /> c. Three springs are being monitored at New Horizon 1, two spoils and <br /> one highwall. Monthly measurements of field water quality parameters <br /> and semi-annual full suite water quality samples are taken. No springs <br /> or seeps have been discovered at New Horizon 2. <br /> 2. The applicant will conduct monitoring of surface water in a manner approved <br /> by the Division. The monitoring plan was submitted under 2.05.6(3)(b)(iii) <br /> and includes the following: (4.05.13(2)) <br /> a. The baseline program (New Horizon 2 - July 1986 to July 1987) <br /> included monthly visits to maintain, service, take flow measurements, <br /> take field parameters and collect full suite water quality samples. <br /> Results of this program are discussed and tabulated in Appendix 3 of the <br /> New Horizon 2 permit application. <br /> b. The current monitoring program will consist of monthly field parameters <br /> and quarterly full suite water quality samples. <br /> c. NPDES sites (sediment pond outlets) will have monthly maintenance, <br /> service, flow measurements, field parameters and quarterly full suite <br /> water quality samples. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.