My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-09_REVISION - M2015009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015009
>
2015-09-09_REVISION - M2015009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:11 PM
Creation date
9/10/2015 3:05:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015009
IBM Index Class Name
Revision
Doc Date
9/9/2015
Doc Name
TR01
From
Operator
To
DRMS
Type & Sequence
TR1
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coy <br />COLORADO lit v 1SiON OF RECLAMATION, MINING AN D SAFETY <br />1.313 Shenuan Street, Room 215, Denver, Culvaidu 8u/ -u3 pnow) 8515-3�67 <br />REO uESi LUK l'LUKINJIUAL REVISION (TR) COVEK SrlEEi <br />Pile No.: M2015-009 <br />county, <br />Chaffee <br />Site Name: Ulyylny the Blues Lode <br />TK# Z! (DRMS Use only) <br />rermittee: Way Up Hiyh Mining Company, LCG <br />Operator (If uther than Permittee): <br />Pei,ii;ttee Representative: FrEid Wilson <br />Plea.3e p►ovide a brief description of the proposed revision: <br />Requesi approval UT Mastiny plan <br />As det►ned by the Minerals Rules; a Technical Kevision (1 K) is: "a change in the p-cH114 or application <br />which does not have more than a in„iiei effect upon the approved or proposed Keclamat;011 01 <br />bnvironmental FrOLection Plan." The Division is charged with determining it the revision a� ;5ubinitted <br />meets this detlnition. It the Division detcini;nes that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal ota pe, mit amendment to make the required or desired change <br />to the permit. <br />J'he ►c4uest for a TR is not considered "tiled for review" mail the appropriate fee is received by the <br />DIV;S;vu (as listed below by permit type). Please submit the appiopiiate fee with your request to <br />expedite the review process. After the IK is submitted with the appLopriate fee, the Division will <br />determine it it ;J approvable within 3U days. It the Division requires add,'t;e,.al information to approve a <br />I K, you will be notificTof specific deficiencies that will need to be add.e3.,cd. if at the end of the 3u <br />day review period the,c a►e still outstanding deticiencies, the Division must de,,p the TR unless the <br />permittee requests add;tim,al time; in writing, to provide the required intormat;vu. <br />1 here is no pre-detmed tormat to, the submittal of a I K; however, it is up to the permirtee to p,ovide <br />sufficient intormation to the Divisioi, iv approve the 1 K request, including updated mining a..d <br />reclamation plan maps that accurately depict the changes proposed in the requested FK. <br />Required Fees for I echnical Kevision by Permit 'l ype - Please mark the correct tee and submit it with <br />you, request for a 1 echnical Kevision. <br />TV u Required '1'R Fee Submitter (mark only one) <br />I I Uc, I 1 1; 112 const, uction <br />materials, and 112 quaff ties $216 RECEIVED <br />1 12 hard rock (not DMO) $1/5 ❑ <br />tr _ r <br />5 U 9 ZU15 <br />1 1 ud, 112d(1, 2 or 3) $1006 ❑ GRAND J DIVI ISION ON OF FIELD OFFICE <br />RECLAMATION MiNING & SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.