Laserfiche WebLink
Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres Total acresToaacres <br />backfilled: � 1 Total Total acres <br />seeded w/ w/topsoil <br />v mulched w/ <br />a roved mix: re laced: a proved mulch: <br />Total acres Total acres <br />Topsoil Mulch application <br />graded: fertilized w/ 1 replacement rate (tons/ac): <br />fertilizer: V <br />a vd de 1-1, <br />de Seed <br />Fertilizer Mulch <br />application application <br />application <br />method: method: method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? YESN/A <br />"YES", <br />If indicate the weed species, control area, control type, application rate and treatment date on(�eport <br />map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? E NO <br />"NO", <br />N/A <br />If please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO <br />"NO" <br />N/ <br />If please explain: <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the tate <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO /A <br />17. Are all hazardous materials stored within approved spill containment structures? I'E NO N/A <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? NO N/A <br />19. Is your basis for legal right to enter still valid? CS, NO <br />20. Does your permit require you to submit monitoring information annually? YES NO� N/A <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the <br />permit boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. <br />UPDATED <br />MAP ATTACHED: <br />