Laserfiche WebLink
Shell Frontier Oil & Gas Inc. <br />Annual Report - COWS Prospecting Notice of Intent (NOI) <br />Report Year: 2015 N01 Anniversary Date: <br />August 22, 2011 <br />NOI Number: P-2010-026 Prospecting Project Name: <br />East RDD Pilot Project <br />PROSPECTOR INFORMATION <br />SURFACE LANDOWNER INFORMATION <br />Prospector: Shell Frontier Oil & Gas Inc. SFOGI <br />Landowner: <br />Bureau of Land Management <br />Address: Woodcreek, A466 -D <br />Address: <br />White River Field Office <br />150 North Dairy Ashford <br />220 East Market Street <br />Houston, TX 77079 <br />Meeker, CO 81641 <br />Telephone: 832-337-4571 <br />Fax: None <br />Telephone: <br />970-878-3800 <br />Contact Person: Florentino Vuelvas <br />email: Flo.Vuelvas shell.com <br />DESCRIPTION OF ACTIVITIES All UTM Coordinates are NAD 1927, Z12 <br />East RDD Test Pad: <br />HOLE/WELL NAME/NO. TYPE UTMNORTHING(m) I UTMEASTING(m) <br />DATE OF LAST PROSPECTING ACTIVITY <br />RECLAMATION B WEED MANAGEMENT ACTIVITIES <br />HW -8101 <br />Heater <br />4420743.750 <br />722384.721 <br />10/302014 (borehole P&A completed) <br />Soil erosion measures in place in 2012 include <br />____________________ <br />HW -8102 <br />__________ <br />Heater <br />___________________ <br />4420753.538 <br />722399.676 <br />(.bore____________ P;_____________________ <br />[2/012014 (borehole P&A com feted <br />sill fence, berms ditches, straw wadding, <br />-----------------'------------- <br />HW -8103 <br />----------------- <br />Heater <br />--- --- <br />4420753.305 <br />---'--"------------------------------------'-'-- <br />722391_180- <br />12/012014 (borehole P&A completed)_ <br />reseeding of sloped areas with cortex in lace. <br />a <br />9 P <br />-------------------------------- <br />HW -8104 <br />----------------- <br />Heater <br />------------------- <br />4420753_070 <br />- - <br />722381.925 <br />--- <br />72/012014 (borehole P&A completed)_ <br />Gravel in place on Rat surfaces to stabilize soil. <br />- <br />HW -8105 <br />._ <br />Heater <br />_ <br />4420733 795 <br />_ ------------- <br />_ _ _ _ <br />11/182014 (borehole P8A completed) <br />Scattered occurrence of Kochia, Halogeton and <br />-------------------- <br />------- ------- <br />-----"--"--- <br />--- ---.464 <br />------------"--- <br />---------'---' ---- -------------- -- - --------- <br />Russian thistle along access roads and soil <br />HW-8108 <br />Heater <br />4420734_044 <br />722 382 .445 <br />11/192014 (borehole P&Acompteted) <br />stockpiles. Noxious weed monitoring. Additional <br />HW -8107 <br />Heater <br />4420734 287 <br />-------- <br />722392 639 <br />--------- -------- <br />11/192014 (borehole P8A completed) _ <br />----------------------------------------------- <br />stortnwater BMPs put in place for the addition of <br />_ ____--------------- <br />HW_8108 <br />- <br />Heater <br />4420753.453 <br />722396_880-_ <br />12/012014 (borehole P&A completed)- <br />the ELHT pad in 2013. P&A work for all installed <br />_ <br />HW -8109 <br />- <br />Heater <br />4420753.237 <br />_-. <br />722388.452 <br />__- <br />(borehole P8A completed)_-_ <br />holes completed in 2014 and surface casing cut <br />------'-----'-'--- <br />HW-8110 <br />----------------- <br />Heater <br />---------------"" <br />4420752.801 <br />"---------'--'--" <br />722371.074 <br />-12/012014 <br />_ --'-------------- <br />12/012014 (borehole PBA competed) <br />off below final grade. Facility demolition and <br />----' "----'------- <br />------------HW-8171 <br />----------------- <br />Heater <br />--------"-'-'---'- <br />4420733.882 <br />-'--------"-'----- <br />722375.276 <br />--------------------------------------- <br />11/192014 (borehole P&A completed) <br />surface reclamation planned for 2015. <br />------------------------------ <br />HW-8112 <br />-------------"-' <br />Heater <br />______-----'----_'_ <br />4420734.219 <br />__"'-------------- <br />722389.777 <br />------------------------------- ----------""------------ <br />11/192014 (borehole P&A completed) <br />-------"---'---------'-'-'-'- <br />HW-8113 <br />-------------"-- <br />Heater <br />--------'-'-------- <br />4420734.413 <br />-'---'------------- <br />722398.257 <br />----------------'-----'------------'-------'-"----------- <br />11/2412014 (borehole PBA completed) <br />PW -8131 <br />Producer <br />4420746.543 <br />722384.653 <br />12/01/2014 (borehole P&A completed) <br />---PW-8132-------------------- <br />----Producer---- <br />_ __ <br />--4420740.904 <br />___________________ <br />722384.772 <br />___________________________________________________________ <br />12101/2014 (borehole P&A completed) <br />O_________W-8121 <br />Observer <br />4420752.807 <br />722373.934 <br />12/012014 (borehole P&A completed) <br />____________________ <br />OW -8122 <br />__________________2___93____5___ <br />Observer <br />4420753.388 <br />722393.995 <br />12/012014 (borehole P&A com le}ed <br />P� <br />------------------------- <br />OW -8123 <br />Observer <br />___________________ <br />4420734.346 <br />___________________ <br />722395.424 <br />___________________________________________________ <br />11242014 (borehole P&A completed) <br />"---'------------------------- <br />OW-8124 <br />----------'--___ <br />Observer <br />____--------------- <br />4420750.113 <br />-___-'------------- <br />722380.765 <br />'-"------------------___--------------------___""------ <br />Drilling completed 12/10; ran 4-12" casing 1211112 <br />-"-----'-----------------1111- <br />OW-8125 <br />--------------"- <br />Observer <br />"'--------"-----' <br />4420733.929 <br />------'------------ <br />722378.068 <br />------------------------------ -------------________------ <br />11/192014 (borehole P&A com feted) <br />____________________ <br />OW -8126 <br />________ <br />Observer <br />_______ <br />4420734.473 <br />_______ <br />722401.036 <br />___________________________ <br />11242014 (borehole P&A completed) <br />LHWA117 <br />Heater <br />4420760.050 <br />722504.260 <br />12/042014 (borehole PBA completed) <br />_____------'-____'------------- <br />LHW-8118 <br />-----------1111 <br />"Heater <br />-"""------------ <br />4420758.210 <br />--'--'--'---'------ <br />722504.340 <br />__________-----------"-"'---------------______"-"___ <br />12A42014 (borehole P&A completed) <br />________ <br />LHW-8119 <br />________________________ <br />Heater <br />4420756.390 <br />722504.420 <br />12/042014 (borehole P8A completed) <br />VW -8129 <br />Observer <br />4420769.180 <br />722503.930 <br />12/04/2014 (borehole P&A completed) <br />135 -4 -298 -SAW[ (OW4124) <br />see OW8124 <br />see OW8124 <br />see OW8124 <br />we OW8124 <br />135-4-298-L4 <br />Hydrology <br />4420760.350 <br />722403.229 <br />10/192011 hydrologic monitoring) <br />138 -0_298 -UT <br />Hydrology/Core <br />4420845_180 <br />722505.560 <br />3222011 (hydrologic monitoring) - - <br />-- __-__- _- <br />138-4-298-A <br />Hydrobgy/Core <br />4420860.410 <br />__ <br />722505.040 <br />_ - -_ <br />3222011 (hydrologic monitoring) <br />_________________ <br />138-4298-B <br />Hydrology/Core <br />4420875.640 <br />722504.530 <br />3222011 (hydrologic monitoring) <br />_____________________________ <br />138-4-298-L5 <br />Hydrology/Core <br />4420890.870 <br />722504.020 <br />3222011 (hydrologic monitoring) <br />138-4-298-L4 <br />Hydrology/Core <br />4420883.700 <br />722517.460 <br />10/182011 (hydrologic monitoring) <br />Is site in final reclamation? <br />No <br />NA (no spraying required- minor occurrence) <br />Is weed control being conducted <br />in accordance with an approved weed management plan? <br />Site construction in progress. <br />Describe any new prospecting activity <br />that occurred during the preceding year (from anniversary date): <br />AFFECTED AREA BOUNDARY <br />Are the area boundaries clearly marked? I Yes (edge of disturbed area is visible and follows affected area boundaries) <br />DATE PROSPECTING ACTIVITY HAS ENDED OR WILL END <br />Date: I December 31, 2017 <br />ACREAGES <br />Number of acres currently affected: 15.36 <br />Number of acres newly affected during current report year. 0.00 <br />Number of acres reclaimed during current report year. 0.00 <br />Estimated no. new acres to be affected in next report year. 0.00 <br />Estimated no. new acres to be reclaimed in next report year: 15.36 <br />Total acres in various stages of reclamation, since permitted prospecting activities began: <br />Total acres backfilled: 0.00 <br />Total acres regraded: <br />0.00 <br />Total acres with topsoil replaced: 0.00 <br />Topsoil replacement depth: <br />6" - 12" range <br />Total acres seeded with approved mix: 3.66 <br />Seed application method: <br />Broadcast seeding followed by raking / discing <br />Total acres fertilized with approved fertilizer: 0.00 <br />Fertilizer application method: <br />No fertilizer use to date <br />Total acres mulched with approved mulch: 1_50 <br />1111___ Mulch apellcation method: <br />____ <br />Curlex <br />_____________________________________________________ <br />1111 _ 1111___ <br />___________________________ <br />Mulch application rale: <br />NA Curlex blanket <br />TOPSOIL MANAGEMENT <br />Is adequate topsoil reserved for reclamation, based on the approved N01? <br />Yes <br />Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />Yes <br />OFFICE OF STATE ENGINEER (OSE) <br />If prospecting has exposed ground water, is the site in compliance with the <br />approved N01 and the requirements of the Office of the State Engineer (OSE)? <br />NA no groundwater exposed during prospecting) <br />CDRMS Annual Report - P-2010-026 Page 1 of 2 <br />