Laserfiche WebLink
TABLE OF CONTENTS <br />SECTION 2.05.3 <br />OPERATION PLAN <br />Introduction..........................................................................................................................1 <br />2.05.3(l) Production Methods and Equipment....................................................................1 <br />2.05.3(2) Detailed Operation Description............................................................................1 <br />2.05.3(3) Mine Facilities......................................................................................................3 <br />2.05.3(4) Ponds, Impoundments, Other Treatment Facilities and Diversions .....................3 <br />2.05.3(5) Topsoil..................................................................................................................3 <br />2.05.3(6) Overburden...........................................................................................................4 <br />2.05.3(7) Coal Handling Structures.....................................................................................4 <br />2.05.3(8) Coal Mine Waste and Non -Coal Processing Wastes...........................................4 <br />LIST OF TABLES <br />TABLE 2.05.3-1 MAJOR MINING EQUIPMENT............................................................4 <br />TABLE 2.05.3-2 ANNUAL MINING OPERATIONS STATISTICS...............................5 <br />TABLE 2.05.3-3 TIMING OF OPERATIONS...................................................................5 <br />LIST OF MAPS <br />Map 2.05.3-1 Typical Pit Cross Section - Mining and Reclamation Plan <br />LIST OF APPENDICES <br />Appendix 2.05.3-1 Montrose County Special Use Permit <br />Section 2.05.3 August 2015 (MR -15) <br />