My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-04_PERMIT FILE - M2015017
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015017
>
2015-09-04_PERMIT FILE - M2015017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:32 PM
Creation date
9/8/2015 11:06:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015017
IBM Index Class Name
PERMIT FILE
Doc Date
9/4/2015
Doc Name
Adequacy Review No. 2
From
DRMS
To
Greg Lewicki and Assoc
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sullivan Pit Engineering Review Memo <br />Page 2 of 2 <br />September 3, 2015 <br />The Factor of Safety calculation provided by the Applicant is not sufficient to elevate the <br />slope stability for the proposed operation. Please perform stability analysis models on the <br />critical slope configurations during the mining and reclamation of the proposed operation. <br />2. The required stability analysis models must include surcharge loads from structures, roads <br />(State Highway 9), topsoil stockpiles and any other appropriate loads. <br />3. The Applicant states during placement of the backfill material, the Operator will compact <br />(the backfill) using standard earthmoving techniques. Please describe the earthmoving <br />techniques to be used during the placement and compaction of the backfill material. <br />4. The Applicant states all material over %" in size will remain in the pit and will be mixed with <br />overburden in the backfill. Please describe how the Applicant will mix and test the over %" <br />material and overburden to achieve a consistent composition for the backfill material. <br />5. The final reclamation slope for the pre -law highwall in the sluice area in inaccurately <br />depicted as a 3H:1V slope on Exhibit C-2 — Mine Plan map in cross-section D -D'. Please <br />update Exhibit C-2 to depict the proposed 2.2:1V reclamation slope. <br />6. Please update the list of structure in Exhibit S to include the minimum distance between the <br />structures to the excavation limit boundary. Please update the Exhibit C-2 — Mine Plan map <br />to indicate the offset distances. <br />7. The Applicant did not provide a typical soil profile description or illustration. Please provide <br />a typical soil profile for the stability analyses models. <br />8. Please provide geotechnical borehole data, if available, for the site for Division review. <br />9. Please provide soil property lab data, if available, for the site for Division review. <br />10. Please provide the Division with the slope stability monitoring plan to be used during mining <br />and reclamation activities at the site. <br />The Division will verify the Applicant's stability analysis models using Clover Technology's <br />Galena v6.1 slope stability software following the Applicant's response to this letter. <br />If you have any questions, please contact me at (303) 866-3567 Ext. -8124. <br />Cc: Wally Erickson; Division of Reclamation, Mining & Safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.