My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-04_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-09-04_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:32 PM
Creation date
9/8/2015 11:04:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/4/2015
Doc Name
Weekly QA Report(8/8-15 & 8/22)
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Placement and compaction of the Phase 1 Structural Fill <br />materials; subgrade acceptance; placement, compaction, density testing, depth verification and <br />acceptance of Soil Liner Fill materials; geomembrane installation and acceptance; Drain Cover Fill <br />placement; pump monitoring at the LVSCS riser pipes; and remediation of underground workings. <br />II) Laboratory Activities: <br />Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected <br />General Project Items <br />Meetings and Discussions: <br />Phase 1 — Soil Liner Fill; 1-SLF-25-R <br />Phase 1 — Soil Liner Fill; 1-SLF-26-R <br />Phase 1 —Soil Liner Fill; 1-SLF-27-R <br />Phase 1 — Soil Liner Fill; 1-SLF-28-R <br />Phase 1 —Soil Liner Fill; 1-SLF-29-R <br />Cameron —Soil Liner Fill; SLF-190-C <br />The Weekly Contractor Meeting was held August 4, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec <br />Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />;- Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: Date: August 11, 2015 <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by: <br />Projects <br />Reviewed <br />Reviewed By. <br />Date: <br />Date: <br />Reviewed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.