CRIPPLE CREEK & VICTOR GOLD MINING Co. AT <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Cat 740 haul trucks transported SLF from the Phase 1 stockpile to the E Bench. A Cat dozer <br />placed SLF between stations E9+00 to E15+00. A Cat smooth drum roller compacted the SLF <br />surface upslope from stations E7+00 to E14+00. A Cat skidsteer and a Cat smooth drum roller <br />reworked and compacted the SLF surface above stations E12+00 and E14+50. <br />A Cat dozer, a Cat excavator and a Cat smooth drum roller placed and compacted SLF between <br />stations FF2+00 to FF6+00. <br />A Cat smooth drum roller compacted SLF upslope from stations FFO+00 to FF2+00. <br />Cat 740 haul trucks delivered SLF to the D Bench. A Cat dozer placed SLF upslope from stations <br />D10+00 to DMO+00. A Cat dozer placed SLF upslope from stations DDO+00 to DM2+00. <br />A Cat dozer placed SLF downslope from stations F8+00 to F10+00 directly from the Phase 1 SLF <br />stockpile. <br />Ames continued processing SLF material at the Cameron stockpile. <br />All of the above Soil Liner Fill material was placed, compacted, and graded per the project plans <br />and specifications. Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />None. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />B) Underground Workings: <br />UG #6313: Step 3 — First and second layer of geogrid placement complete. First and second <br />layer of Select Structural Fill placed and compacted per project plans and specifications. <br />Remediated. <br />** COMPLETED REMEDIATION OF ALL PHASE 1 UNDERGROUND WORKINGS ** <br />C) Geomembrane: <br />