My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-04_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-09-04_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:32 PM
Creation date
9/8/2015 11:04:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/4/2015
Doc Name
Weekly QA Report(8/8-15 & 8/22)
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. AT <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />Cat dozers placed SLF directly from the Phase 1 stockpile to the area between F0+00 to F10+00. <br />Cat 740 haul trucks transported SLF from the Phase 1 stockpile to the D Bench, DD Bench, DM <br />Bench and FM Bench. Cat dozers continued building an SLF road upslope from stations D10+00 <br />to DM3+00. Cat dozers placed SLF downslope from stations FM12+00 to FM15+00. <br />Cat dozers placed SLF downslope of stations D0+00 to D4+00 and HHO+00 to HH2+00. <br />All of the above Soil Liner Fill material was placed, graded, and compacted per the project plans <br />and specifications. Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: A Cat 330 excavator prepared approximately 250 LF of trench <br />to tie into the existing downgradient secondary underdrain. Approximately 250 LF of <br />additional secondary underdrain was completed per project plans and specifications. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />A Cat 35 excavator extended the leak detection trench approximately 50 LF across the FM Bench <br />in the vicinity of station FM10+00. Leak detection was constructed and backfilled per project <br />plans and specifications. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.