My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-04_REPORT - M1977129
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977129
>
2015-09-04_REPORT - M1977129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 11:47:33 AM
Creation date
9/8/2015 11:03:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
Report
Doc Date
9/4/2015
Doc Name
Annual Fee/Report/Map
From
Whitewater Building Materials
To
DRMS
Annual Report Year
2015
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHITEWATER BUILDIN <br />MATERIALS CORP. <br />WHITEWATER 500 PIT <br />W 20 4-15 ANNUAL REPORT <br />4+651.1 SHEET 2 OF 2 //V(` 77-/029 <br />RAW MATERIAL t46�'1 <br />STOCKPILE AREA <br />600 ACRES t <br />v 4e4a5 + <br />11 \ STAGE 6 <br />L�v-�� 70.57 AC. f 6 <br />\,1.27 <br />FRESH WATER P�D <br />ACRES b <br />+4e44.0 <br />\ <br />o <br />�<Q <br />Q <br />I <br />Z 46437 <br />a + <br />\ <br />/ Q <br />Z y <br />Q <br />ct <br />\ <br />\\ • <br />_— <br />—�` <br />Ix <br />J <br />46426 <br />Q + <br />\ o <br />\ <br />STAGE 3 — PART A <br />\\ <br />28.944Z. t t141 6 <br />+ <br />46424 <br />\ \ <br />441.1 411.4 <br />-t440.3 <br />4747.7 .II + <br />N467 <br />L, <br />Sj <br />0 <br />e. <br />46424 <br />4421 + I� , <br />A +4LtL6 <br />+ STAGE 3 -PART B <br />+477.4 108.07 AC. t <br />�.7 <br />+437.3 / <br />+46X7 <br />+'4]6.4 +4°76.5 <br />4676.1 / <br />4&UA / — <br />+ <br />1:676.4 <br />/ O / <br />462L <br />PART 6 <br />46IL2 II o 0 /o <br />RAIL MATERIAL STOCKPILES - 9.45 ac3 <br />�\ <br />MINING COMPLETED — 34.55 act <br />STRIPPED IN 2014-2015 — 16.26 act \\ •' <br />LAKE AREA — 13.26 act 1 <br />\\\\ OVERBURDEN PILES — 6.85 ac.t <br />SLOPING COMPLETED — 1.70 act <br />TOPSOIL/MSHA SAFETY BERM RECEIVE <br />1 <br />PARTIALLY BACKFILLED <br />AREA 6.01 act p \\ •' <br />SEP 0 4 2015 6 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />1 +4313 <br />t�1 <br />CONTOUR INTERVAL 5 R. <br />SCALE 1' - 500• <br />AUG 31. 2015 — 11:35:33 <br />E N D <br />AFFECTED LANDS <br />200 FOOT LINE <br />ROAD <br />POWER/ COMMUNICATION <br />LINES <br />TREES <br />BUILDING <br />:,-� +474° 1 <br />+430.4 <br />+ <br />47os •�.. ••i <br />+4671.4 + <br />STAGE 4 — PART A <br />71.48 AC. t 6 4sio <br />+ +4su4 <br />+� <br />+4Lus <br />+4670.1 + 7 <br />+ 477° <br />4"'o + JJ <br />+46" <br />+� <br />
The URL can be used to link to this page
Your browser does not support the video tag.