My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-04_REPORT - M1977129
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977129
>
2015-09-04_REPORT - M1977129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 11:47:33 AM
Creation date
9/8/2015 11:03:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
Report
Doc Date
9/4/2015
Doc Name
Annual Fee/Report/Map
From
Whitewater Building Materials
To
DRMS
Annual Report Year
2015
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />SEP 0 4 2015 <br />DIVISioa ?,uk LAMATION, <br />G 8 SAFETY- ERALS <br />FE REPORT MAP <br />n off- sf9 <br />112c Annual Report <br />Page 3 of 4 <br />Permittee Name: <br />Whitewater Building <br />Materials <br />Permit Number: <br />M-1977-129 <br />Operation Name: <br />Whitewater Pit 500 <br />County: <br />Mesa <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />September 22, 2015 <br />Permit Acreage: <br />491.70 <br />Current Bond Amt: <br />$287,500.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES XO( <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES XOO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? W NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? active mine <br />5. Does the mine operate more than 180 days per year? YES X01 <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? )$ NO <br />b) approval for INTERMITTENT OPERATION? YES )(R <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). 140.93 <br />8. Number of acres that were newly affected during the current report year. 19.10 <br />9. Number of acres that were reclaimed during the current report year. 0 <br />10. Estimated new acreage to be affected in the next report year. 20.00 <br />11. Estimated acres to be reclaimed in the next report year. 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.