Laserfiche WebLink
�d <br />RECEIVED <br />SEP e4 2015 <br />DIVIStc,:� -�-.;L MiATION <br />IWAi4zPAMTAOPREPO <br />110(2) Annual Report <br />Page 3 of 5 <br />Permittee Name: <br />lue Jet Mining Inc <br />Permit Number: <br />M -1978 -135 -HR <br />Operation Name: <br />Blue Jet Mine <br />County: <br />Moffat <br />Annual Fee Due: <br />$259.00 <br />Anniversary Date: <br />September 9, 2015 <br />Permit Acreage: <br />9.90 <br />Current Bond Amt: <br />$2,500.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1)? YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)?YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />Am* N►3TieALI. rr;[C,SEHATt i34PCA' OPCt1-A-PUC Q� VAC4,AV 49 M��vaORC,t <br />4. What was the'age e of last excavate(fn, processing or hauling activity at the mine? 91//V / /y <br />MAft�rQi,gt tivAS NAvj 6Q FQc A /Oo,v,p RACC A.IS ► <br />5. Does the mine operate more than 180 days per year MS ) NO <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES JM <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year: <br />9. Number of acres that were reclaimed during the current report year: <br />10. Estimated new acreage to be affected in the next report year: <br />D <br />O <br />E <br />wA,AWs avAy !vo w <br />11. Estimated acres to be reclaimed in the next report year: It V NW ° Av N No <br />7W N A S /v o I )5 i S ni A tv y %eS l )0 i T S <br />NATo C46AW ?AIPAC SAiI< w!►V <br />AjQ !.f o c AVS c o f T N c Q,4 n A Q r/9 A ? TP c," <br />CaW' QD, w14cA-` 47 C4CA,v rA,i& )PAC C= r RC Mcs/& G ARde SAs%# iES <br />6%PZ-AiI1c 47 1 PIS P7"0 'y`Na 84 *-%. A mo S?,dT£ wH IFN 2 wAS <br />A.Jp,ac 7 cO T141S Y,'a,P. Ti,/A W4 Yo u d -t <br />