Laserfiche WebLink
September 5, 2014 <br />Mr. Steve Fancher <br />LOVELAND READY MIX <br />P.O. Box 299 <br />Loveland, CO 80539-0299 <br />on <br />Resurvey of Gas Line Monitoring Points Batch Plant Site, Weld County Road 54 CDS Project No. <br />P02-1783 <br />Dear Mr. Fancher: <br />This letter is to state the results of the checking of the gas line monitoring points set in <br />March of 2002. <br />On May 13, 2014, a survey of Points 1 through 9 and 11 through 23 showed no significant <br />difference or movement from the original survey. During the last survey we discovered that Point <br />number 10 has been destroyed by some sort of construction and is no longer useable, during this <br />survey we discovered that monument number 19 has also been destroyed. <br />Currently, the extraction areas are adjacent to Points 1 through 23. <br />If you have questions regarding this information, please call our office. <br />Sincerely, <br />FOR AND ON BEHALF OF <br />CDS ENGINEERING CORPORATION <br />// <br />Michael J. De <br />Survey Supe ryr <br />I <br />SLS 20676 <br />165 2nd Street S.W. • Loveland, CO 80537 • (970) 667-8010 • Fax (970) 667-8024 • www.cds-enq.net <br />