My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-16_PERMIT FILE - C1992080 (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992080
>
2015-06-16_PERMIT FILE - C1992080 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 2:29:12 PM
Creation date
9/2/2015 2:25:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Permit File
Doc Date
6/16/2015
Section_Exhibit Name
Appendix 3-2 Right of Entry Updated 2015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OAKRIDGE ENERGY, INC. <br />4613 OLD JACKSBORO HIGHWAY <br />wicur 'A VAU S, TEXAS 10302 <br />PHONE (940) 322.4772 <br />FAX (940) 322-9452 <br />chinriccIAO(t oiE,i1.cam <br />Junc 10, 2015 <br />Marc and Jane Katz <br />3051 E 5th Avenue, <br />Durango, CO 8130 t <br />]to: Right of Entry to Carbon .(unction Minc — Permit No. C-1 992-080 <br />Pennit Renewal No. 4 (RN -04) <br />Dear Marc and Jane, <br />The Colorado Division of Reclamation, Mining and Safety requires that Oakri <br />in place to allow access to the reclamation site. I have outlined the anticipated <br />be needed to the Carbon Junction Mine permit area. They are as follows: <br />;y, Inc, have a docunncnt <br />for which access would <br />Calendar Year 2015 <br />Vegetation sampling at the reference area and within reclaimed areas during n 'd -late June. This sampling <br />should lake approximately one week (6-7 days) on-site. Vehicle access woulc be restricted to existing roads <br />and two -tracks, with no off road travel. necessary, <br />Compliance repairs or activities required by CDRMS inspectors (typically, th� bivalves wood control, <br />erosion repair, or like tasks), to be conducted by representatives of Oakridge. <br />Calendar Year 2016 <br />Vegetation sannpliug at the mfcrence area and within reclaimed areas during t 'd -late June. This sampling <br />should take approximately one week (G-7 days) ou-site. Vehicle access wail be restricted to existing roads <br />and two -tracks, with no off road travel necessary. <br />Compliance repairs or activities rcxluired by CDRMS inspectors (typically, th' involves weed control, <br />erosion repair, or like tasks), to be conducted by representatives of Oukriclge, <br />7'lno CDRMS will continue to conduct. quarterly inspections throughout the ror <br />anticipate submittal of a iunal bond release application to the CDRMS in early <br />jurisdiction by the CDRMS in late 2016 or early 2017. <br />Please provide contact information in the space provided below regarding how <br />access to be made. <br />bond liability period. We <br />2016, and termination of <br />would prefer notice of such <br />
The URL can be used to link to this page
Your browser does not support the video tag.