My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-31_REPORT - M1989120
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1989120
>
2015-08-31_REPORT - M1989120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:19 PM
Creation date
9/2/2015 12:31:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989120
IBM Index Class Name
REPORT
Doc Date
8/31/2015
Doc Name
Annual Fee, Report & Map
From
Aggregate Industries - WCR, Inc
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Broda's Inert Fill <br />14677 Harvest Road <br />Brighton, CO 80603 <br />April 30, 2015 <br />Mrs. Connie Davis <br />Aggregate Industries — WRC, Inc <br />1707 Cole Blvd., #100 <br />Golden, Colorado 80401 <br />Re: 2014 Annual Report <br />Broda's Inert Filling at Aggregate Industries — Platte Valley Operations <br />Dear Mrs. Davis: <br />As stipulated in the Lease Agreement between Aggregate Industries and Patrick Broda <br />and Harrison Broda, this annual report has been prepared and is submitted to you. The <br />information included herein is for the calendar year 2014. <br />General Summary of Operations: <br />The filling of Parcel A is progressing according to plan. The Colorado Department of <br />Public Health and Environment (CDPHE) confirmed that the facility is regulated under <br />the Recycling provisions of the Regulations Pertaining to Solid Waste Disposal Sites and <br />Facilities. Groundwater monitoring wells were monitored semi-annually. The deliveries <br />of inert materials are based upon the local economy and the volumes are down compared <br />to 2013. CDPHE has required that asphalt be segregated for subsequent placement above <br />the groundwater table or crushed and reused on-site or off-site. The asphalt collected has <br />been crushed and used on site for dust suppression and is above the water table. Other <br />than the information in this report there have been no incidents of significance and the <br />operations have gone well. <br />Volume of Materials Placed: <br />The volume of materials placed during the calendar year 2014 is 21,890 cubic yards. <br />Testine and Monitoring Reports: <br />Groundwater monitoring wells MW -1, MW -2, and MW -3 were sampled on 5/5/2014 and <br />11/19/2014. The monitoring wells were analyzed for parameters listed in Appendix IA <br />and 113 of CDPHE regulations. Lake samples and mud truck samples were not taken. <br />
The URL can be used to link to this page
Your browser does not support the video tag.