Laserfiche WebLink
August 20, 2015 C-1981-012/New Elk Mine LDS <br />diversion ditches, but Mr Massarotti was already aware and has plans to clean those ditches as part of his regular <br />maintenance program. <br />There was no discharge from any of the ponds. <br />The silt level in the river was noticeably high, but there was not currently any need for NECC to remove <br />material. <br />GENERAL MINE PLAN COMPLIANCE: <br />RN6 is in progress. NECC is waiting on an adequacy letter from the Division. <br />MR123 is in progress. <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />The newly deposited development waste was being spread and compacted during the inspection. <br />A 350 gallon diesel tank had been temporarily placed on the RDA to allow the dozer operator to refuel. <br />The tank was protected by a berm and a high visibility fence. <br />REVEGETATION — Rule 4.15 <br />Vegetative Cover; Timing: <br />The Canada thistle patches noted in the last inspection had been sprayed. <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 9 <br />