My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-24_ENFORCEMENT - M2004031
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2004031
>
2015-08-24_ENFORCEMENT - M2004031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:08 PM
Creation date
8/28/2015 12:07:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
ENFORCEMENT
Doc Date
8/24/2015
Doc Name
Petition for Board Review
From
Board State of Colorado
To
DRMS
Email Name
TOD
WHE
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Department of Public Health and Environment for Water <br />Quality. <br />• The Bull Seep was relocated and mitigation wetlands constructed in <br />accordance with approved Army Corp. of Engineers 404 Permit (DA File <br />No. 199980194). AI's proposal does not include any changes to the <br />approved 404 Permit. <br />Finally, the Division denial of TR -05 inaccurately states that the proposed <br />permanent groundwater mounding mitigation plan intends to influence lands located <br />beyond the approved boundary of affected lands. This again is inaccurate because: <br />• AI's groundwater mounding mitigation plan provides for installation of <br />structures within the permit boundary and proposes only to mitigate <br />mounding on the Orr property to the extent that groundwater elevations <br />increase on that property as a result of the slurry wall surrounding the <br />Hazeltine Mine. Al does not seek to drain the Orr property to the extent <br />it would affect lower groundwater elevations below pre -slurry wall <br />conditions, nor does it seek to mitigate non -project related influences to <br />groundwater or surface water fluctuations or changes resulting from <br />surrounding local conditions, including precipitation, river flows, land use <br />or water uses. <br />• Mitigation of the adjacent Orr property is the subject of the Board's Order <br />based on a Complaint filed by Orr. Notice to Orr should not be required <br />since not only did he attend the hearing but he and his consulting <br />engineer, Steve O'Brian have in fact been to the Orr property with <br />representatives of both the Division and the Operator. Mr. O'Brian <br />acknowledges that the temporary plan is working and is aware that <br />enhancements to the temporary system are intended to provide a <br />permanent mitigation solution. There are no other adjacent lands outside <br />the Hazeltine permit boundary that will be affected by the proposed <br />mitigation plan. Any other adjacent property is on the other side of the <br />Fulton Ditch from the mine site which is not hydrologically connected. <br />RELIEF REQUESTED <br />Aggregate Industries as the Operator of the Hazeltine Mine respectfully <br />requests that the Board review and reverse the Division's determination of July 24, <br />2015 and allow the Operator to proceed with TR -05. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.