Laserfiche WebLink
-4- <br />12. Primary future (Post -mining) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />D Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />✓ Developed Water Rescurces(WR) <br />13. Primary present land use (check one): <br />✓ Cropland(CR) Pastureland(PL) <br />II Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Ems! IndustriaUCommercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dewatered dry mining, scraper, excavator, haul trucks, conveyors <br />15. On Site Processing: WCrushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavator, loader <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />none <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Amendment includes adding Cell 4 / Reservoir #4 changing reclamation plan form slurry wall to <br />compacted clay liner. <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />IndustriaUCommercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Ems! IndustriaUCommercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dewatered dry mining, scraper, excavator, haul trucks, conveyors <br />15. On Site Processing: WCrushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavator, loader <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />none <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Amendment includes adding Cell 4 / Reservoir #4 changing reclamation plan form slurry wall to <br />compacted clay liner. <br />