My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-25_REVISION - M1999060
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999060
>
2015-08-25_REVISION - M1999060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:29 PM
Creation date
8/28/2015 12:01:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999060
IBM Index Class Name
REVISION
Doc Date
8/25/2015
Doc Name
Application CN01
From
DRMS
To
Yocam Gravel Pit
Type & Sequence
CN1
Email Name
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 Yocam Pit M-1999-060 Expansion <br />a. type of reclamation — type will be placing prior excavated materials onto <br />excavated sites followed by the placement of topsoil, then seeding. Chosen <br />because it's the most feasible. <br />b. the pit will be reclaimed to a rangeland use, the same as the other land <br />uses in the vicinity <br />C. <br />i. 3.1.1 (1) The affected lands will be reclaimed as rangeland. <br />ii. 3.1.2 not applicable. <br />iii. 3.1.3 will comply. <br />iv. 3.1.4 not applicable. <br />v. 3.1.5 <br />1. final slopes will not be steeper than 3:1. <br />2. will comply. <br />3. will comply. <br />4. will comply. <br />5. no refuse and acid forming or toxic materials should be <br />mined <br />6. no drill or auger holes should be used <br />7. finished slopes will be no steeper than 3:1 except in areas <br />where no mining activities will take place (naturally <br />existing slopes). <br />8. finished use is rangeland. <br />9. no structural materials will be used to backfill <br />10. will comply. <br />11. will comply. <br />vi. 3.1.6 <br />1. will comply. <br />2. will comply. <br />3. will comply. <br />vii. 3.1.7 <br />1. this operation is not expected to directly affect groundwater <br />systems. <br />2. 2-9 noted. <br />viii. 3.1.8 <br />1. see existing permit information. <br />2. see existing permit information. <br />ix. 3.1.9 <br />1. Will comply. <br />2. 2-8 will be followed as needed <br />x. 3.1.10 <br />1. 1-9 will be followed as they pertain to rangeland <br />reclamation. <br />xi. 3.1.11 noted. <br />xii. 3.1.12 1-3 will comply. <br />xiii. 3.1.13 spills will be reported as required. <br />d. see existing permit information. <br />W 1999-060 Yocam Pit Expansion Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.