My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-27_REVISION - C1981020
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981020
>
2015-08-27_REVISION - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:14 PM
Creation date
8/27/2015 10:18:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Revision
Doc Date
8/27/2015
Doc Name
Letter & Application and Public Notice
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR26
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zach Trujillo -2- August 24 2015 <br />2. DRMS: In the fall of 2014, CAM conducted reclamation on the sediment pond and <br />associated topsoil pile. Please provide applicable updates regarding the sediment pond and <br />associated topsoil stockpile to the following sections: <br />�. Section 2.0 Mine Plan, page 2-1, paragraph 1 <br />1 Section 2.2.4 Storage and Stockpile Sites <br />4. Section 2.2.51 Topsoil Available for Reclamation <br />Section 2.3.4 Sedimentation Controls <br />1 Section 3.2.2 Volumes of Topsoil Available for reclamation <br />Section 3.2.3 Topsoil Salvage <br />CAM: Please see revised pages 2-1, 2-10, 2-11, 2-23, 2-26, and 3-5. <br />3. DRMS: In the fall of 2014, CAM removed all culverts from drainages that passed below the <br />remaining haul road. Please provide an updated Section 3.3.4, Reclaimed Ephemeral channels <br />regarding removal of haul road culverts <br />CAM: Please see revised page 3-14 <br />4. DBMS: Please provide updated discussions regarding remaining reclamation work schedule <br />and reference to the revised reclamation cost estimate in Section 3.8 Reclamation schedule <br />and costs. An updated reclamation cost estimate associated with MT -07 is attached. <br />CAM: Please see revised page 3-20 <br />Sincerely, <br />�Yagw-4- e4-A-� <br />Tamme Bishop, P.E. <br />Project Engineer <br />Enclosure: <br />Volume I: Pages 2-1, 10, 11, 23 & 26 and 3-5, 14 & 20 <br />Volume II: Please REMOVE Figures 1.1-3A & 2.2-15 <br />Cc: Bureau of Land Management <br />Mesa County Clerk & Recorder <br />
The URL can be used to link to this page
Your browser does not support the video tag.