Laserfiche WebLink
411 <br />COLORADO <br />Division of Water Resources <br />Department of Natural Resources <br />Office of the State Engineer <br />1313 Sherman St, Suite 818 <br />Denver, CO 80203 <br />Response to Reclamation Permit Amendment Application Consideration <br />DATE: <br />August 24, 2015 <br />TO: <br />Dustin M. Czapla, Environmental Protection Specialist <br />CC: <br />Division 2 Office; District 11 Water Commissioner <br />G <br />RECEIVED <br />FROM: <br />Caleb Foy, P.E. <br />RE: <br />Hard Rock 291 Pit, File No: M-1977-195 ' <br />Auti 2 b Z015 <br />Operator: Hard Rock Paving and Redi-Mix, Inc. <br />Contact: Angela Bellantoni, (719) 275-8951 <br />DIVISION OF RECLAMATION, <br />Sec. 30, Twp. 50N, Rng. 9E, N.M.P.M., Chaffee County <br />MINING AND SAFETY <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, <br />exposure of ground water must not occur during or after mining operations. If <br />stormwater is contained on-site, it must infiltrate into the ground or be released to <br />the natural stream system within 72 hours, or all work must cease until a substitute <br />water supply plan, or augmentation plan approved by water court, is obtained. <br />Reclamation plans must ensure water will not be retained onsite for more than 72 <br />hours unless an augmentation plan approved by water court is obtained. <br />COMMENTS: N/A <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 F 303.866.3589 www. water. state. co. us <br />t4 ji <br />