Laserfiche WebLink
Mr. Peter Foster <br />August 13, 2015 <br />Page 3 of 6 <br />that would lead to abandonment of the pit. Such explanation and/or documentation must <br />be included with the next SWSP renewal request. <br />DEPLETIONS <br />The out -of -priority depletions for the facility during this approval period are expected to be <br />112.9 acre-feet/year of evaporation from a water surface area not to exceed 39.1 acres, 3.53 <br />acre-feet/year of water lost in product, 3.22 acre-feet/year from concrete batching, and <br />0.56 acre-feet/year for dust suppression (see Table 2). Total consumptive use from the pit <br />operation is expected to be 120.21 acre-feet/year. It is understood that return flows from <br />gravel washing will be taken as a credit in this plan. Lagged depletions were calculated using <br />the Glover depletion factors decreed for the pit by the Division 7 Water Court in Case No. <br />07CW104 (see Table 3). At full build -out, after gravel operations have ceased and the de - <br />watered areas are allowed to fill with water, it is anticipated that 39.1 acres of water will be <br />exposed resulting in 112.9 acre-feet of depletions (see Table 1). The operation will be <br />covered by this SWSP and not the decreed augmentation plan. Therefore, water sales will not <br />be allowed under this SWSP. <br />REPLACEMENT <br />The water supply currently decreed as an augmentation source for the Bayfield Facility is the <br />Gosney Alternative Pump Station. The Applicant has a lease agreement, attached, with <br />Gosney Et Sons, Inc. that is effective so long as the Lessee owns the property or until the <br />Lessee terminates the water lease, for an amount of 0.7 cfs. This pump station is decreed to <br />supply up to 1 cfs for augmentation of water use at the Facility. A call is placed on the Pine <br />River generally throughout the irrigation season from May 1 through October 30 by The Pine <br />River Canal. The pump station is located on a tributary to the Pine River in an area that is <br />considered to have water available for appropriation. The water will be delivered to the <br />Bayfield Facility or directly into the Pine River Canal either by ditch or pipeline as directed by <br />the Water Commissioner. Table 3 shows that all out of priority depletions are less than the <br />0.7 cfs replacement water available, therefore; the Applicant has shown that they have <br />adequate replacement water to cover depletions through the period of this SWSP approval <br />and at full build out with the existing lease. <br />CONDITIONS OF APPROVAL <br />I hereby approve the proposed substitute water supply plan in accordance with Section 37-90- <br />137(11), C.R.S., subject to the following conditions: <br />This SWSP shall be valid for the period of April 20, 2015 through April 20, 2017, unless <br />otherwise revoked, modified, or superseded by decree. Should an addition SWSP be <br />requested, such renewal request must be submitted to this office with the statutory fee <br />of $257 at least 90 days prior to the expiration date of this plan. <br />2. The plan for augmentation decreed in case no. 03CW65 may not operate during the life of <br />this SWSP plan, and the replacement water assigned to that plan for augmentation will be <br />utilized under this plan. <br />/ OF Cp�C <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 F 303.866.3589 www. water. state. co. us <br />