My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-25_REVISION - C1982056 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2015-08-25_REVISION - C1982056 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:11 PM
Creation date
8/26/2015 9:20:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/25/2015
Doc Name
Adequacy Review
From
Jared Ebert
To
Twentymile Coal, LLC
Type & Sequence
MR287
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclamation of the Coreholes Proposed with MR287 <br />Site: Foidel Creek Mine Permit Action: MR287 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/25/2015 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1982056 <br />Abbreviation: None <br />Filename: 0056-000 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Plug and seal 8 drill holes BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />115.20 <br />$51,035.39 <br />$13,634.00 <br />$1,710.00 <br />$7,430.00 <br />$9,329.00 <br />Regrade Drill Pads and Mud Pits DOZER <br />63.33 <br />Regrade Access Roads DOZER <br />7.94 <br />Replace Topsoil on Drill Pads and Access Road DOZER <br />34.51 <br />Reseed 12.9 acres of Corehole disturbance REVEGE <br />12.90 <br />SUBTOTALS: <br />233.88 <br />$83,138 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$1,679.39 <br />Performance bond: <br />1.05% <br />Total = <br />$872.95 <br />Job superintendent: <br />116.94 hrs <br />Total = <br />$8,789.21 <br />Profit: <br />10.00% <br />Total = <br />$8,313.80 <br />TOTAL O & P = <br />$19,655.35 <br />CONTRACT AMOUNT (direct + O & P) = <br />$102,793.35 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.25% <br />Total = $4,368.72 <br />Reclamation management and/or administration: <br />5.00% <br />$5,139.67 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $29,163.73 <br />TOTAL BOND AMOUNT (direct + indirect) = $112,301.73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.