Laserfiche WebLink
RECEIVED <br />AUG 18 2015 <br />DIVISI; ,Y n'c,LAMATION <br />MINING & SAFETY-MINERACA <br />FEE REPORT MAP FW <br />112d-1 Annual Report <br />Page 2 of 3 <br />Permittee Name: Gold Eagle Mining, Inc. Permit Number: M-1977-248 <br />Operation Name: C -JD -5 County: Montrose <br />Annual Fee Due: 1,150.00 Anniversary Date: June 16, 2015 <br />Permit Acreage: 10.00 Current Bond Amt: 100.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YE NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities be an: <br />YES <br />YESX10 <br />YES <br />v <br />Total acres <br />backfilled: <br />Total acres <br />seeded w/ <br />approved mix: <br />Total acres <br />w/topsoil <br />replaced: <br />Total acres <br />mulched w/ <br />approved mulch: <br />Total acres Total acres Topsoil Mulch application <br />graded: fertilized w/ replacement rate (tons): <br />apvd fertilizer: depth (in.): <br />Seed Fertilizer Mulch <br />application application application <br />method: method: method: