Laserfiche WebLink
August 11, 2015 C-1982-056/Foidel Creek Mine JLE <br />Figure 30. 6MN Diversion Ditch Repair <br />TC has repaired the south east drainage channel located on the 5MN cement borehole pad. The channel has been <br />re -shaped and line with rip -rap. Erosion control waddles were in place at the base of the channel. <br />Figure 31. 5MN Cement Borehole Channel Repair <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 18 of 20 <br />