Laserfiche WebLink
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />August 20, 2015 <br />Mr. Tim Haynes <br />Climax Molybdenum Company <br />Henderson Mill <br />P.O. Box 68 <br />Empire, CO 80438 <br />Re: Henderson Mine, Permit No. M-1977-342, Technical Revision No. 23 (TR -23), Ute Park <br />Wellfield Project, Phase 1, As -Built Drawings and Construction Certification Acceptance <br />Mr. Haynes: <br />On August 20, 2015, the Division of Reclamation, Mining and Safety (Division/DRMS) accepted the <br />as -built drawings and construction certification submitted to the Division on June 8, 2015, <br />addressing the following: <br />• Submittal of the final as -built drawings and construction certification provided by AJAX, <br />Clear Creek, W. W. Wheeler and Logical Systems for Phase 1 of the Ute Park Wellfield <br />Project. <br />The terms of Technical Revision No. 23 approved by the Division are hereby incorporated into <br />Permit No. M-1977-342. All other conditions and requirements of Permit No. M-1977-342 remain <br />in full force and effect. <br />If you have any questions, please contact me at (303) 866-3567 Ext. 8124. <br />Sincerely <br />Peter S. Hays <br />Environmental Protection Specialist <br />Cc: Wally Erickson; DRMS <br />_61l <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director *` <br />1876 %' <br />