Laserfiche WebLink
August 11, 2015 C-2009-087/Peabody Sage Creek Mine JLE <br />Figure 3. Channel CH -2 repairs <br />• Near the inlet to the Lower Sump from drainage FA -D8 where the drainage turns to drain into the sump, <br />the west side of the drainage is eroding and cutting into the slope above. PSCM will need to stabilize this <br />area. <br />o This item has been addressed and the repairs have been made. Rock has been placed in the area <br />where water was side -cutting the slope. <br />Figure 4. Repairs to FA -D8 at inlet to lower sump <br />• The weir at Pond 003 is leaking and will need to be repaired. <br />o This issue has been addressed and the weir repaired. <br />• Some houndstongue was observed on Topsoil Pile A and will need to be treated. <br />o Houndstongue, White -top and thistle was observed throughout the site. PSCM will need to <br />implement their weed control plan. It appears that PSCM has conducted weed control spraying <br />throughout the facilities area. The Division appreciates this effort. This is as on-going <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: I <br />Page 5 of 10 <br />