Laserfiche WebLink
HAYWARD <br />BAKER <br />Geotechnical Construction <br />Schwartzwalder <br />Water Testing Report <br />Job Number: <br />600443 <br />Start Time: <br />Job Location: <br />Golden, CO <br />8:32 AM <br />Hole Number: <br />F2 <br />Top Depth (ft): 40.0 <br />Stage Number: <br />4 <br />Bot Depth (ft): 51.5 <br />Test Number: <br />1 <br />Closure Lugeon: <br />12228.28 <br />Total Vol. (gal): 56.9 <br />20 <br />- <br />= 15 <br />•N <br />- - <br />- <br />- <br />CL <br />10 <br />L <br />N <br />y5 <br />- <br />--- <br />--- <br />- - - <br />L <br />a <br />0 <br />0.0 <br />1.0 <br />2.0 <br />14.0 <br />12.0 <br />10.0 <br />8.0 <br />CL <br />°.° 6.0 <br />0 4.0 <br />2.0 <br />0.0 <br />0.0 <br />Top EI (ft): -40.0 <br />Bot EI (ft): -51.5 <br />Water EI (ft): 0.0 <br />Date: <br />6/19/2015 <br />Start Time: <br />8:27 AM <br />End Time: <br />8:32 AM <br />Duration: <br />00:05:00 <br />Pay Time: <br />6 min <br />Gauge Pressure Effective Pressure <br />3.0 4.0 <br />Time (min) <br />5.0 6.0 <br />14000.0 <br />12000.0 <br />100.0 <br />v <br />iD00.0 <br />00.0 <br />k00.0 <br />2000.0 <br />0.0 <br />0.0 1.0 2.0 3.0 4.0 5.0 6.0 <br />Time (min) <br />Comments <br />Time ITech Icomments <br />1.0 2.0 3.0 4.0 5.0 6.0 <br />Time (min) <br />No comments submitted for this Water Testing operation. <br />