Laserfiche WebLink
SIMPLE OIL LLC <br />OIL SHALE RD&D PROJECT <br />WELL CONSTRUCTION SPECIFICATIONS (PROPOSED) <br />2016 Proposed <br />OSR-1 <br />RD&D Oil Shale <br />Recovery Well <br />CONDUCTOR HOLE & CASING (CON) <br />CON OPEN HOLE/BIT DIAMETER, in. maximum 30.0 <br />CON OPEN HOLE TD, ft. GL 100.0 <br />CON CASING, CEMENTED, SET DEPTH, ft. GL 100.0 <br />CON CASING SIZE, OD in. 24.0 <br />CON ANNULUS, in. 3.0 <br />INTERMEDIATE HOLE & CASING (INT) <br />INT OPEN HOLE/BIT DIAMETER, in. 19.0 <br />INT OPEN HOLE TD, ft. GL 2,900.0+/ - <br />INT CASING, CEMENTED (thermal), SET DEPTH, ft. GL 2,330.0+/ - <br />INT CASING SIZE, OD in. 16.0 <br />INT ANNULUS, in. 1.5 <br />PRODUCTION EQUIPMENT SPECS <br />5.5" OD SS 316 CASING 5.0" ID), CEMENTED (thermal), SET DEPTH, ft. GL <br />2,350.0+/ - <br />NITROGEN GAS CAP SET DEPTH, ft. GL <br />VARIABLE <br />2.0" OD HOT OIL DUAL STRING CLOSED LOOP RECIRCULATION TUBING, <br />SS 316, SET DEPTH, ft. GL <br />2,872.0+/ - <br />2.0" OD PRODUCED VAPOR RECOVERY TUBING, SS 316, SET DEPTH, ft. GL <br />,810.0+/- <br />2,810.0+/- <br />2.0" OD PRODUCED OIL RECOVERY TUBING, SS 316, SET DEPTH, ft. GL <br />L 2.0" <br />2,870.0 +/- <br />Daub & Associates, Inc. Page 1 of 1 August 2015 <br />