My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-17_REVISION - M1988090
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988090
>
2015-08-17_REVISION - M1988090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:20:24 PM
Creation date
8/19/2015 4:36:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988090
IBM Index Class Name
REVISION
Doc Date
8/17/2015
Doc Name
Comments AR01
From
Deer Trail Conservation District
To
DRMS
Type & Sequence
AR1
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEER TRAIL CONSERVATION DISTRICT <br />133 West Bijou Avenue <br />BYERS, CO 80103 <br />303-822-5257 EXT. 101 <br />August 11, 2015 <br />Colorado Division of Reclamation <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RECEIVED <br />Auu 1 / 2015 <br />DIVISION OF RECLAMATION, <br />MWING AND SAFETY <br />Joe Lindsay, President <br />Darrel Stoner Vice President <br />John R Price, Sec/Treas. <br />Joey Kalcevic, Member <br />Larry Sargent, Member <br />RE: 5A Aggregate LLC, Deer Trail Pit, Permit No. M-1988-090 <br />Dear Tyler, <br />• During the construction phase we would like to see the top soil <br />stripped and stockpiled out of the way of area to be mined and later <br />brought back in after the pit is all done with the mining operation <br />and spread at a depth of 3 to six inches deep. The stockpile should <br />be on a 3:1 side slope and protected from any wind or water erosion. <br />• During the mining operations, the soil should be excavated on a 3:1 <br />side slope and all stockpiled soil that is mined and not loaded should <br />be protected with best management practices so it doesn't blow or <br />wash away during construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.