My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-18_PERMIT FILE - C1982056
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2015-08-18_PERMIT FILE - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:00 PM
Creation date
8/19/2015 1:13:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
8/18/2015
Doc Name
5MN Cement Borehole Design Information (MR14-285)
Section_Exhibit Name
Exhibit 49CC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br />5 MN Borehole to 6 MN Pond <br />Buried Dewatering Line <br />07/28/15 <br />I. The Contractor shall obtain and maintain record keeping forms as required by the Mine <br />Safety and Health Administration (MSHA) and applicable State Agencies. <br />J. The Contractor shall keep the Owner promptly informed of all injuries to the <br />Contractor's employees that require medical treatment. <br />K. The Contractor shall keep the Owner informed of all federal and state safety <br />inspections, citations, and penalties. <br />L. The Contractor shall make safety inspections to insure that compliance with safety <br />standards is being carried out by the Contractor's employees. <br />M. The Contractor shall investigate all accidents that occur in the Contractor's phase of the <br />Work to determine the causes of the accidents and take the appropriate measures to <br />eliminate said causes. <br />N. The Contractor shall conduct and document safety meetings to instruct the Contractor's <br />employees in recognition and avoidance of construction hazards. <br />O. The Contractor shall be willing to participate in labor-management safety committees to <br />enforce safety regulations and eliminate potential safety hazards. <br />P. The Contractor shall have a documented emergency evacuation program and coordinate <br />this program with the Owner. <br />Q. The Contractor shall be responsible for keeping the Work areas free of debris and trash <br />on a daily basis. <br />R. The Contractor shall provide adequate fire protection for the Contractor's construction <br />shops, change rooms, and equipment. <br />S. The Contractor shall obtain necessary permits from the Owner as required by the <br />Owner, e.g., parking, excavation, entry to confined spaces, use of Owner's equipment <br />and tools, etc. <br />T. The Contractor shall comply with all project rules and security rules as issued by the <br />Owner. <br />U. The Contractor shall comply with the Owner's "Clearance System" covering the <br />tagging -out and locking -out of equipment and electrical systems. <br />V. On Projects where wrap-up insurance is in force, the Contractor shall cooperate in <br />participating in supervisory safety training programs provided by the insurance carrier. <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.