Laserfiche WebLink
Mr. Rob Zuber <br />August 17, 2015] <br />Page 3 <br />ITEM 49. On page 8, the sampling point UTC and other sampling points are not in the table. If <br />these points are no longer sampled, add annotations to Map IOB. <br />Response: On Map l OB, the surface water monitoring locations that are not part of the current <br />monitoring program contained in Section 4.05.13 of Volume 15, have been revised to denote <br />they are not part of the current monitoring program. <br />ITEM 50. The introductory sentence for Section 4.05.18 appears to contradict the rule. Please <br />re -write the text to agree with the rule and reflect the situation for creeks related to the Collom <br />project. In particular, describe the situation with Little Collom Gulch; it is the Division's <br />understanding that the drainage area for Little Collom is greater than a square mile, and <br />therefore this drainage needs to be addressed in the stream buffer zone discussion. The last <br />sentence in Section 4.05.18 contains an extra word: "are. " <br />Response: The first sentence in Section 4.05.18 has been revised as requested. Additionally, a <br />discussion on Little Collom Gulch has been added to Section 4.05.18 as requested. The last <br />sentence in Section 4.05.18 has also been corrected as noted. <br />ITEM 51. Please confirm that there are no power lines near the blasting areas, or, if they do <br />exist, please add this to text in Section 4.08.2. <br />Response: The text in Section 4.08.2 has consolidated with a Pre -Blast Survey section directly <br />beneath in Section 4.08.2. The text has not been updated to address power lines as was <br />requested. A citation in Section 4.08.2 directs the reader to Exhibit 14, Item 8, which contains a <br />figure of structures (including power lines) located within a half -mile of the permit area, and pre - <br />blast surveys offering letters that were sent out to these owners in 2010. <br />ITEM 52. In Section 4.08.2, the sentence before the heading "Colorado Oil and Gas Registered <br />Facility Locations" is apparently missing .some words. Please edit. <br />Response: As noted in response to Item 51, the two pre -blast survey sections have been <br />consolidated under Section 4.08.2. <br />Table 2.04.9-16 <br />ITEM 53. The following corrections should be made to Table 2.04.9-16. <br />a. The date should be corrected. The table currently reads, "Collom topsoil balance as <br />of'March 13, 20151 ". Please correct the date to reflect 2015. <br />b. Line 3 of the table "Lands Yet to Be Retopsoiled (Line I Minus 2) " should apparently <br />have a value of 2,352.8 acres. Please explain or correct this line. <br />APA)"Ji 4P <br />, <br />A Touchstone Energy'C:ooperative - 4 . <br />