Laserfiche WebLink
• <br />0 <br />Doc Date:1211112001 <br />JJ2.03.6 RIGHT OF ENTRY AND OPERATIONAL INFORMATION <br />iii iiiii►iiiiii999 <br />ii� <br />The following is a description of the documents upon which EFCI basis its legal <br />right to enter those lands within the permit area for the purpose of conducting <br />surface coal mining operations. <br />The permit boundary of the Mine Site situates within the lands described in the <br />following legal documents. A full legal description of the permit boundary is shown <br />on Pages 2.03-40a and 2.03-40b of this section. <br />A. Assignment of Leases, dated March 22, 1985, between Dorchester Coal <br />Company and Energy Fuels Associates, Ltd. This assignment transferred <br />all coal and surface leases in effect on the above date. <br />2.03-29 <br />Revised 2119199 <br />RN -03 <br />