Laserfiche WebLink
The waste water treatment ponds, Pond E, D and Area 1 pond were holding water. The pond embankments appear <br />stable. <br />Figure 6. Main facilities area. <br />Coal refuse appears to have recently placed on the 2nd bench of the CRDA expansion area. The northeast end of <br />the refuse pile has been graded. The face of the first bench appears vegetated and stable. The topsoil and cover <br />material pile adjacent to the CRDA appears stable. <br />