Laserfiche WebLink
Pt?K <br />August 12, 2015 <br />Mr. Peter S. Hays <br />Division of Reclamation, Mining & Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />A/ <br />Re: Permit No. M-1999-098 — Riverview Resource <br />✓ Cell 3 Breach Repair <br />Dear Peter: <br />RECEIVED <br />AUG 13 2015 <br />DIVISION OF RECLAMATION, <br />MINING AND SAFETY <br />9 <br />AGGREGATE <br />INDUSTRIES <br />As required under the Division's inspection report of the Riverview Resource operation on June <br />26, 2015, enclosed is a survey of the section of the northern bank of the southeast section of Cell <br />3 following completion of the repair of the breach. The repair was completed by July 31, 2015, <br />prior to the corrective action due date of August 3. Per Aggregate Industries' request and the <br />Division's approval, the corrective action date was extended to August 17 to allow time for the <br />survey of the repaired breach area to be completed. <br />As shown on the survey, the breach area was restored to the pre -flood topography, tying into the <br />same topography as the undamaged bank. As further verification, enclosed are photographs that <br />were taken before, during and after the repair on July 30-31. <br />Please let me know if you have any questions or need additional information to close out this <br />corrective action item. <br />Very truly yours, <br />Connie N. Davis <br />Land Advisor <br />Enclosures <br />Aggregate Industries <br />West Central Region, Inc. <br />1687 Cole Boulevard, Suite 300 <br />Golden, CO 80401 <br />Telephone: 303-985-1070 <br />An Equal Opportunity Employer <br />