Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 065 Page 3 of 3 <br />Haul Rnute- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />Time <br />min <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />-1.00 <br />4254 <br />0.652 <br />min <br />1 <br />2640.00 <br />4.00 <br />3.00 <br />7.00 <br />1134 <br />2.399 <br />Haul Time: <br />Return Rnute- <br />2.399 <br />minutes <br />C[RCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Loading Tool unit <br />1 <br />2640.00 <br />-4.00 <br />3.00 <br />-1.00 <br />4254 <br />0.652 <br />C[RCES Cost Estimating Software <br />Return Time: 0.652 <br />minutes <br />Total Truck Cycle Time: 6.751 <br />minutes <br />Loading Tool unit <br />Production <br />562.50 <br />LCY/Hour Adjusted for job efficiency: <br />466.88 LCY/Hour <br />Truck Unit Production <br />224.97 <br />LCY/Hour Adjusted for job efficiency: <br />186.72 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 373.44 <br />LCY/Hour <br />Adjusted single truck/loader team production: 373.44 <br />LCY /Hour <br />Adjusted multiple truck/loader team production: 373.44 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 3.75 <br />Hours <br />Unit cost: <br />$1.273 <br />/LCY Total job cost: $1,783 <br />C[RCES Cost Estimating Software <br />