My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-12_PERMIT FILE - C1981018A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2015-08-12_PERMIT FILE - C1981018A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 12:56:52 PM
Creation date
8/13/2015 1:08:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
8/12/2015
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPACTION WORK <br />Task description: Cmpact Refuse at RP 2/3/4, 5a, and Facilities Area Refuse <br />Site: Deserado Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 029 State: Colorado <br />Date: 7/16/2014 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: 029 <br />Basic Machine: CAT 815F Horsepower: <br />Compactor Type: Soil - tamping foot Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />MATERIAL OUANTITIES <br />240 <br />1 per day <br />(CRG) <br />Loose volume: 380,000 LCY Shrinkage factor: 0.870 <br />Compacted volume: 330,600 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Unadjusted hourly production = (W x S x L x Cl / P <br />Utilization % <br />Ownership Cost/Hour: <br />$36.81 <br />NA <br />Operating Cost/Hour: <br />$82.25 <br />100 <br />Operator Cost/Hour: <br />$28.75 <br />NA <br />Total Unit Cost/Hour: <br />$147.81 <br />Required number of machine passes (P): <br />Total Fleet Cost/Hour: <br />$147.81 <br />Unadjusted Hourly Unit Production: <br />MATERIAL OUANTITIES <br />240 <br />1 per day <br />(CRG) <br />Loose volume: 380,000 LCY Shrinkage factor: 0.870 <br />Compacted volume: 330,600 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Unadjusted hourly production = (W x S x L x Cl / P <br />Compacted width per pass (W): <br />6.50 <br />feet <br />Average Compactor Speed (S): <br />4.00 <br />mph <br />Compacted thickness of each lift (L): <br />10.00 <br />inches <br />Conversion Constant (C): <br />16.3 <br />(5,280ft. /12in. /27cu.ft.) <br />Required number of machine passes (P): <br />3 <br />passes <br />Unadjusted Hourly Unit Production: <br />1,412.67 <br />CCY/hour <br />Job Condition Correction Factors <br />Site Altitude: 5,300 feet <br />Source <br />Altitude Adj: 1.00 <br />CAT HB <br />Job Efficiency: 0.83 <br />1 shift/day) <br />Net Correction: 0.8300 <br />multiplier <br />Adjusted Hourly Unit Production: <br />1,172.51 <br />CCY /Hour <br />Adjusted Hourly Fleet Production: <br />1,172.51 <br />CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) <br />Total job time: <br />281.96 Hours <br />Unit cost: $0.126 per CCY Total job cost: $41,676 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.