My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-12_PERMIT FILE - C1981018A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2015-08-12_PERMIT FILE - C1981018A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 12:56:52 PM
Creation date
8/13/2015 1:08:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
8/12/2015
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Temporary Refuse from Facilities Area to RP -5a <br />Site: Deserado Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 028 State: Colorado <br />Date: 7/16/2014 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cast Breakdown: <br />Truck/Loader Team <br />Eauipment Description <br />Abbreviation: None <br />Filename: 028 <br />Shift basis: 1 per day <br />Cat 770D <br />CAT 980H <br />NA <br />NA <br />NA <br />NA <br />Sunnort F.auinment <br />Maintenance F,auinment <br />Total work team cost/hour: $797.37 <br />MATERIAL OUANTITIES <br />Initial volume: 48,333 CCY Swell factor: 1.000 <br />Loose volume: 48,333 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,950 Pounds/LCY <br />Description: Slag - broken <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 27.80 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />75 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$48.57 <br />$43.89 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$89.44 <br />$57.43 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$26.72 <br />$37.13 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$164.73 <br />$138.45 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $797.37 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $797.37 <br />MATERIAL OUANTITIES <br />Initial volume: 48,333 CCY Swell factor: 1.000 <br />Loose volume: 48,333 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,950 Pounds/LCY <br />Description: Slag - broken <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 27.80 LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.